Similar Projects
Godwin 4 IN. Dri-Prime HL 125M Emergency Water Pump 2021
Infrastructure
Post-Bid
Waterbury, CT

Replace Chilled Water Pump CHWP-4
Infrastructure
Post-Bid
Farmington, CT

Occum Hall Fire Pump Replacement Project
Results
Windham, CT 06226

High Rise Geothermal Heat Pumps Replacement
Results
$197,800 est. value
Windham, CT 06226

Goodwin Park Irrigation and Booster Pump Improvements
Infrastructure, Alteration
Post-Bid
Hartford, CT

Grinder Pump for Low Pressure Sewer Collection System
Results
Waterford, CT

Primary Effluent Pump Replacement
Infrastructure
Post-Bid
Thomaston, CT 06787

Rehabilitation and Reconditioning of Fish Wells at Two State DEEP Hatcheries
Results
Kensington, CT

Mechanical and Electrical Repair of Wastewater Pumps, Mixers, and Motors for the SWPCA
Term Contract
Post-Bid
Stamford, CT

Citywide Maintenance and Repair of Various Drains and Pumps
Results
Stamford, CT

Two Ductless Heat Pumps
Infrastructure
Post-Bid
East Haven, CT

WWW Hydraulic Turbine High Lift Pump and High Lift Pump 1 Repairs Project
Infrastructure
Results
Mansfield, CT

Stamford Campus Pump Replacement
Infrastructure
Results
Stamford, CT 06901

Well Pump Installation
Infrastructure
Results
Woodbury, CT 06798

Installation of GHWTP Effluent Pump No. 3 Variable Frequency Drive
Infrastructure
Results
Manchester, CT

Last Updated 04/21/2022 01:39 PM
Project Title

USCG Replace Condensate Receiver Pump Sets

Physical Address View project details and contacts
City, State (County) New London, CT 06320   (New London County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $150,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Regional Multiple Award Construction Contract (RMACC) Region 1 - Task Order - Contractor shall provide all labor, equipment, materials, transportation, supervision, and disposal necessary for the removal and replacement of three (3) Condensate Return Units (CRU) at the - Chase Hall - D Annex Johnson Hall - Leamy Hall. The work also includes the removal and replacement of all associated piping, fittings and electrical.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents