Similar Projects
Swing Check Valves Repair - Utilities
Post-Bid
Largo, FL 33778

Equipment Calibration, Repair, and Replacement - Utilities
Post-Bid
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

SR-580 Water Main Tie-Ins
Results
Less than $341,286 est. value
Dunedin, FL 34698

Structure Tops R and R North County Sugar Bear Trail
Infrastructure
Post-Bid
$876,892 est. value
Clearwater, FL

Water Main Improvements at ALT US 19 to Omaha Street Delaware Avenue to Nebraska Avenue (PID 004017A)
Results
Less than $1,399,413 est. value
Palm Harbor, FL 34683

Force Main 8 Replacement
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Espiritu Santo Springs and Washington Brennan Subdivisions Water Main Replacement Project
Results
Less than $1,890,000 est. value
Safety Harbor, FL

West Central Avenue Watermain and Streetscape Project
Infrastructure
Post-Bid
$6,000,000 est. value
Saint Petersburg, FL 33747

Shore Acres Water Main Replacement
Results
$1,600,000 est. value
Saint Petersburg, FL 33731

Utility Rehabilitation and Construction Services
Term Contract
Results
Tarpon Springs, FL 34688

Construction of Harbor Palms Infrastructure Project Phase 2
Results
Oldsmar, FL

Coating of 36 Inch Wtm; Restoration of Potable/Reclaimed Water Mains
Results
Saint Petersburg, FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Advanced Metering Infrastructure
Results
FL

Last Updated 11/24/2021 11:05 AM
Project Title

Philippe Pointe Pedestrian Bridge Water Main Project

Physical Address View project details and contacts
City, State (County) Safety Harbor, FL   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $565,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• Installation of 8-inch C-900 PVC DR-18 water main by open cut • Installation of 8-inch C-900 PVC DR-18 water main by subaqueous horizontal directional drill • Installation of locate stations • Abandonment of existing water main • Restoration of curb, driveways, sidewalks and site restoration • Installation of road base, asphalt pavement, and concrete sidewalk and curbing • Maintenance of Traffic

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents