Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Sealcoating and Striping at Various Locations
Results
Lake Zurich, IL

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Road Program
Results
Lake Zurich, IL

Rollins Road Water Main Improvements
Post-Bid
$168,300 est. value
Waukegan, IL

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Hydrant Assemblies 2021-2022
Term Contract
Post-Bid
Waukegan, IL

2021 Street Maintenance
Results
IL

2021 Road Repairs
Term Contract
Post-Bid
Antioch, IL

RR-21-4575R - Plaza Improvements
Results

Water Main Improvements
Infrastructure
Post-Bid

Last Updated 10/12/2022 12:07 AM
Project Title

2022 Water Main Replacement Program

Physical Address View project details and contacts
City, State (County) Zion, IL 60099   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,198,079 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 16, 2022, the project was awarded to Campanella & Sons, Inc for $1,198,078.97. The proposed work is officially known as "2022 WATER MAIN REPLACEMENT PROGRAM" and further described as the construction of approximately 4,000 lineal feet of new 8" ductile iron water main, valve boxes, fire hydrants, new water service connections, proposed storm sewer, reconstruction of existing alleys, and all required restoration in Zion, Illinois, as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). Various Alleys within the City of Zion.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents