Similar Projects
Dock & Shed Rehab
Alteration
Design
$1,000,000 to $5,000,000 est. value
Bayfield, WI

Low Impact Design Improvements Woodstock Bay Project
Infrastructure
Bidding
Superior, WI 54880

126' Aluminum Truss Dock
Post-Bid
Scandinavia, WI 54977

Pewaukee Lake Boat Launch Reconstruction
Post-Bid
Pewaukee, WI 53072

Courtesy Dock and Ramp
Results
Prescott, WI 54021

Instrumentation for Prestressing Miter Gate Diagonals - Lock & Dam 4
Results
Alma, WI 54610

Fountain City Service Base Phase II Design Build
Post-Bid
Fountain City, WI

Pine Lake Boat Launch Access Improvements
Results
Chenequa, WI

Deck Replacements - Single Family Homes - USCG Housing Sturgeon Bay, Wisconsin
Term Contract
Post-Bid
Sturgeon Bay, WI 54235

Pier 1 Water and Decking
Results
Washburn, WI 54891

Pier and Buoy Maintenance
Term Contract
Post-Bid
Lake Geneva, WI

Columbus - Watertown, Beaver Dam River
Results
WI

Concrete Sidewalk and Loading Dock Replacement
Infrastructure
Post-Bid
Eagle River, WI 54521

Sandy Beach Boat Launch
Results
Lake Mills, WI

Ship Lift Electrical And Control Building
Renovation
Post-Bid
$3,000,000 to $3,200,000 est. value
Marinette, WI 54143

Last Updated 03/28/2022 10:14 AM
Project Title

Hubbard Park Canoe and Kayak Launch

Physical Address View project details and contacts
City, State (County) Shorewood, WI 53211   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project area starts the terminus of N. Morris Blvd in Hubbard park and follows a graded path to the northwest towards the Milwaukee River. The project requires earthwork grading and placing of large snapped and outcrop stone for a canoe and kayak launch. 1. Approximately 35 CY of earthwork grading. 2. Installation of approximately 29 tons of placed stone. 3. Installation of approximately 40 tons of placed boulders. 4. Installation of approximately 16 pieces of snapped stone. 5. Approximately 1,600 SF of reseeding

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents