Similar Projects
Illinois Bridge Pedestrian Crossing Improvements - City of Mason City
Infrastructure
Conception
$200,000 CJ est. value
Mason City, IA 50401

Highway 122 Reconstruction - City of Mason City
Infrastructure
Conception
$11,150,000 CJ est. value
Mason City, IA 50401

Hangar Pavement Rehabilitation Phase 2 - City of Mason City
Infrastructure
Design
$340,000 CJ est. value
Mason City, IA 50401

Cedar River Safety and Recreational River lmprovements Phase I - City of Cedar Falls
Infrastructure
Design
$4,831,000 est. value
Cedar Falls, IA

Ogden Maintenance Facility, Boone County Secondary Roads Division
New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Ogden, IA 50212

DHS Cherokee Mental Health Institute - New Parking Area
Infrastructure
Bidding
$450,000 CJ est. value
Cherokee, IA 51012

Water Meter Replacement
Infrastructure
Post-Bid
$800,000 est. value
Hazleton, IA

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

Cedar Rock State Park New Fueling Station
Infrastructure
Results
$15,701 CJ est. value
Independence, IA 50644

RCB Culverts New-Single Box, HMA Resurfacing on Thunder Road Project
Infrastructure
Results
$1,844,360 CJ est. value
Guttenberg, IA 52052

Cass County Sanitary Landfill Final Closure and Transfer Station Grading
Infrastructure
Construction
$450,000 CJ est. value
Atlantic, IA 50022

Cass County Sanitary Landfill Final Closure and Transfer Station Grading
Infrastructure
Construction
$450,000 CJ est. value
Atlantic, IA 50022

Aikey Auto Salvage Storage Building
New Construction, Infrastructure - 5,200 SF
Pending Verification
$560,000 CJ est. value
Waterloo, IA 50703

Waterloo Aquatics Master Plan
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Waterloo, IA 50701

Scrip Road Pedestrian Trail - City of Mason City
Infrastructure
Conception
$225,000 CJ est. value
Mason City, IA 50401

Last Updated 10/09/2023 11:02 AM
Project Title

Water Treatment and Cooling System Discharge Line

Physical Address View project details and contacts
City, State (County) Alta, IA 51002   (Buena Vista County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $7,523,050 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 09, 2023, project was awarded to JB Holland. but awarded amount is not available.** This is a private bid letting so no results will be posted. Site Directions: The Work shall be constructed on Platinum Crush LLC property, private easements and county road right-of-way. Contract I Settling Pond and Lift Station 25,000 LY on-site borrow 12,000 SY 80 mil HDPE liner 1 lift station, valve vault and flow meter Necessary restoration and miscellaneous construction Contract II Force Main Segment A 47,043 LF 8" force main directional drilled 8 air release structures 120 LF 16" casing pipe installation under state highway (boring/jacking) Necessary restoration and miscellaneous restoration Contract III - Force Main Segment B 48,800 LF 8" force main directionally drilled 10 air release structures 82 LF 16" casing pipe installation under state highway (boring/jacking) Necessary restoration and miscellaneous restoration Contract IV - Diffuser Coffer dam/bypass pumping of north Raccoon River 102 LF 12" diffuser 405 LF 8" force main 2 access manholes Necessary restoration and miscellaneous construction Work shall commence upon the issuance of a written notice to proceed (estimated September 27, 2023).Work shall be substantially complete by no later than December 29, 2023. All work shall be completed and ready for final acceptance by May 31, 2024. Each bid must be accompanied in a separate envelope by a bidding check or bid bond in an amount equal to five percent (5%) percent of the bid price, said check being either a certified or cashier's check, drawn on a bank in Iowa, or a bank chartered under the laws of the United States, or a Certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, and made payable to the Platinum Crush, LLC, Alta, Iowa, as security that the bidder will furnish the required bonds and enter into a contract within ten(10) working days, excluding Saturday, Sunday, and holidays, after the award of the contract to him Platinum Crush, LLC, reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the Question Deadline 09/07/2023 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Submit these items to the following: Thomas K. Madden, SEH Project Manager, 215 North Adams, Mason City, Iowa 50401 , Tmadden@sehinc.com. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents