Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington
Infrastructure
Design
$2,190,000 est. value
Bloomington, IL 61701

Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

Sunnyside Court, Sidewalk, Porch, and Siding Replacement
Infrastructure, Renovation
Bidding
$560,000 CJ est. value
Bloomington, IL 61701

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

Oak Street Water Main Replacement
Alteration
Results
Normal, IL

White Oak Road and Hovey Avenue Water Main Extension
Infrastructure
Results
Normal, IL

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

The Trails at Sunset Lake
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Water Extension
Infrastructure
Post-Bid
Downs, IL

Division Street Water Main Replacement Project
Infrastructure
Results
$596,181 CJ est. value
Chenoa, IL 61726

Last Updated 11/15/2022 10:03 AM
Project Title

2022 Main and Harris CIPP Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Normal, IL 61761   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $432,225 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Normal Public Works Department will receive sealed bids for the following: 2022 Main & Harris CIPP Sewer Rehabilitation Work includes, but is not limited to, installing approximately 783 lineal feet of 48-inch and 60-inch diameter cured-in place-pipe (CIPP) in existing sanitary sewers of various sizes, along with associated service reinstatements and site restoration. The Town of Normal reserves the right to reject any or all bids received and to waive any formalities in the bidding procedures. The bid award will be made by the Town Council and their decision will be final

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents