Similar Projects
Last Updated | 04/06/2021 11:36 AM |
Project Title | CIP85-Water Main Replacement Project - Joffre / Wiggin Street |
Physical Address | View project details and contacts |
City, State (County) | Concord, NH 03301 (Merrimack County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $694,391 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Works includes, but is not limited to: the layout, testing, operation and removal of 997 LF of 2” and 2330 LF of 4” temporary water main, including four temporary fire hydrants; the removal of 1648 LF of 6” cast iron and 567 LF of 2” plastic water main and replacement with 43 LF of 6”, 2266 LF of 8” and 14 LF of 12” cement lined ductile iron, zinc coated, water pipe, including three new and relocate one existing fire hydrant; the replacement of existing sanitary sewer services and storm sewer catch basin laterals; and traffic maintenance. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |