Project Title | Milling 2.5 Inches of Existing Pavement and Placing an Overlay |
Physical Address | View project details and contacts |
City, State (County) | CO (Denver County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of milling 2.5 inches of existing pavement and placing an overlay of 2.5 inches of Stone Matrix Asphalt (Fibers) (Asphalt) on Federal Blvd. (US 287C). The limits of the project are from Colfax Avenue to I-70. The overlay is to be placed on the entire width of the roadway including turning lanes. Structure E-16-FJ which falls within these limits will also be milled and overlaid with 3 inches of Stone Matrix Asphalt (Fibers) (Asphalt). 202-00200 Removal of Sidewalk 904.000 Sy 202-00206 Removal of Concrete Curb Ramp 1,489.000 Sy 202-00240 Removal of Asphalt Mat (Planing) 79,039.000 Sy 202-04010 Clean Inlet 98.000 Each 203-01597 Potholing 120.000 Hour 208-00054 Storm Drain Inlet Protection (Type Ii) 98.000 Each 210-04010 Adjust Manhole 130.000 Each 210-04050 Adjust Valve Box 76.000 Each 212-00006 Seeding (Native) 0.100 Acre 212-00040 Soil Preparation (Lawn) 8.800 Acre 304-06000 Aggregate Base Course (Class 6) 847.000 Ton 403-00720 Hot Mix Asphalt (Patching) (Asphalt) 1,226.000 Ton 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 11,980.300 Ton 411-10255 Emulsified Asphalt (Slow-setting) 7,904.000 Gal 608-00000 Concrete Sidewalk 210.000 Sy 608-00010 Concrete Curb Ramp 2,411.000 Sy 608-00015 Detectable Warnings 430.000 Sf 613-10000 Wiring 1.000 L S 614-72854 Traffic Controller Cabinet 1.000 Each 614-72863 Pedestrian Push Button Post Assembly 8.000 Each 614-86800 Uninterrupted Power Supply 1.000 Each 620-00002 Field Office (Class 2) 1.000 Each 620-00012 Field Laboratory (Class 2) 1.000 Each 625-00000 Construction Surveying 1.000 L S 625-00001 Construction Surveying (Hourly) 240.000 Hour 626-00000 Mobilization 1.000 L S 626-01113 Public Information Management (Tier Iii) 100.000 Day 627-00013 Pavement Marking Paint (High Build) 884.000 Gal 627-30410 Preformed Thermoplastic Pavement Marking (Xwalkstop Line)17,017.000 Sf 630-00000 Flagging 800.000 Hour 630-00003 Uniformed Traffic Control 750.000 Hour 630-00004 Traffic Control Vehicle 1.000 Each 630-00012 Traffic Control Management 170.000 Day 632-00000 Night Work Lighting 1.000 L S |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |