Similar Projects
2021-A Street Overlay
Post-Bid
Monticello, MN

North Smoky Hills Graveling
Renovation
Post-Bid

Waverly Lake Phase 4 Improvements
Results
$3,500,000 est. value
Waverly, MN

2021 Seal Coating
Results
MN

Advanced Volumetric Alliance Factory
New Construction, Infrastructure - 180,000 SF
Construction
$10,000,000 CJ est. value
Albertville, MN

Lake Maria State Park - Waterline Replacement
Alteration
Post-Bid
Monticello, MN 55362

Wright County Parks and Recreation (Collinwood Regional Park Paving Improvements)
Results
Cokato, MN 55321

Fallon Avenue NE Reconstruct
Infrastructure
Post-Bid
Monticello, MN 55362

2021 Pavement Preservation
Results
MN

2021 Street Maintenance Project
Results
$165,000 est. value
Otsego, MN

2021 Street Micro-Surfacing Project
Results
$373,000 est. value
Otsego, MN

Central City Road and Utility - Phase 2
Results
MN

Discovery ES Parking Lot Rehabilitation
Results
Buffalo, MN 55313

Fenning Avenue Reconstruction
Results
$5,000,000 est. value
Monticello, MN 55362

2021 Street Improvements
Results
Albertville, MN

Last Updated 10/14/2021 04:20 PM
Project Title

2021 Street Improvements Project

Physical Address View project details and contacts
City, State (County) Maple Lake, MN   (Wright County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, Work consists of the construction of storm sewer improvements and street construction with approximately the following quantities: • 2,080 LF of 12” & 15” RCP Storm Sewer Pipe • 550 LF of PVC Sanitary Sewer Pipe • 4,435 LF of 6”-12” PVC Watermain Pipe • 7,400 LF of 4” Drain Tile • 16,000 SY of Bituminous Reclamation • 13,100 CY of Common Excavation • 4,200 CY of Aggregate Base • 7,715 CY of Select Granular Borrow • 14,750 SY of Geotextile Road Fabric • 3,475 TN of Bituminous Course Mixtures • 7,400 LF of Concrete Curb and Gutter • 11,880 SF of Concrete Driveway Aprons & other Miscellaneous restoration items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents