Similar Projects
Ballard Street Culvert Restoration
Bidding
Saugus, MA

Scheduled and Emergency Drainage Structure and Pipe Cleaning at various Locations
Results
Less than $900,000 est. value

Boat Ramp and Retaining Wall Improvements
Results
Less than $350,000 est. value
Ipswich, MA

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $409,271 est. value

Ferry Lane Sewall Repair Project
Results
Less than $50,000 est. value
Marblehead, MA 01945

Fort Sewall - Fort Restoration Phase II
Results
Less than $146,000 est. value
Marblehead, MA

Harvard Avenue Seawall Repair
Results
Less than $20,000 est. value
Marblehead, MA

Gallison Avenue Seawall Repair Project
Results
Less than $50,000 est. value
Marblehead, MA

Foundation Drainage Repairs
Results
Less than $29,600 est. value
Methuen, MA 01844

Parker Lane Seawall Repair
Results
Less than $20,000 est. value
Marblehead, MA

Peabody Lane Seawall Repairs
Results
Less than $20,000 est. value
Marblehead, MA

Scheduled A Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $964,171 est. value

Drilling IDIQ in Massachusetts and Rhode Island
Results

Barker Street Culvert Replacement
Results
Less than $280,000 est. value
North Andover, MA

Chinking & Pointing Fort Beach Seawall
Results
Less than $50,000 est. value
Marblehead, MA 01945

Last Updated 01/08/2020 11:08 AM
Project Title

Crescent Marsh Culvert Replacement Under Unnamed Access Road to Wheelabrator Technologies

Physical Address View project details and contacts
City, State (County) Saugus, MA 01906   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,739,542
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $14000","100." "0.100","a","Clearing And Grubbing","101." "3440.000","Cy","Unclassified Excavation","120.1" "800.000","Cy","Muck Excavation","123." "1250.000","Cy","Topsoil Excavated And Stacked","125." "560.000","Cy","Sand Borrow Excavated And Stacked","125.1" "2300.000","Sy","Pavement Milling","129." "10.000","Cy","Test Pit For Exploration","141.1" "10.000","Cy","Class b Rock Excavation","144." "1230.000","Cy","Ordinary Borrow","150." "300.000","Cy","Gravel Borrow","151." "200.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "1080.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "10.000","Cy","Sand Borrow","154." "560.000","Cy","Sand Borrow (Cover)","154.1" "440.000","Ton","Crushed Stone For Bridge Foundations","156.1" "1.000","Ls","Environmental Health And Safety Program","180.01" "200.000","Hr","Personal Protection Level c Upgrade","180.02" "490.000","Ft","Cutting Hdpe Liner","180.5" "3940.000","Cy","On-Site Handling And Disposal Of Waste/Fill Material","181.16" "300.000","Cy","Treatment And Disposal Of Hazardous Waste (Tclp)","181.17" "2.000","Ea","15 Inch Tide Gate","227.115" "25.000","Sy","Stone For Pipe Ends","258." "70.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "4600.000","Lb","Calcium Chloride For Roadway Dust Control","440." "125.000","Mgl","Water For Roadway Dust Control","443." "390.000","Ton","Superpave Surface Course – 19.0 Polymer (Ssc – 19.0 - p)","450.241" "130.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "160.000","Gal","Asphalt Emulsion For Tack Coat","452." "240.000","Ft","Hma Joint Sealant","453." "90.000","Ft","72 Inch Chain Link Fence (Ptr) w/Barb (Line Post Option)","647.072" "15.000","Ft","72 Inch Chain Link Gate With Gate Posts And Barbed Wire","651.072" "640.000","Ft","Temporary Fence","657." "630.000","Ft","Temporary Fence Removed And Reset","657.5" "80.000","Ft","Chain Link Fence Removed And Discarded","664." "700.000","Sy","Geotextile Fabric For Separation","698.3" "520.000","Sy","40mil Hdpe Liner","698.5" "1830.000","Sy","Geogrid For Stabilization","698.6" "4.000","Day","Extrusion Welding","699.5" "12.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1250.000","Cy","Topsoil Rehandled And Spread","752." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "6520.000","Sy","Seeding","765." "1000.000","Ft","Sediment Control Barrier","767.121" "80.000","Sy","Turf Reinforcing Mat","767.72" "145.000","Sy","Jute Mesh For Erosion Control Fabric","767.731" "350.000","Sf","Safety Signing For Traffic Management","852." "230.000","Ft","Temporary Pedestrian Barricade","852.11" "2.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "4.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "60.000","Ft","Temporary Barrier Removed And Reset","853.21" "14.000","Day","Arrow Board","856." "2200.000","Day","Reflectorized Drum","859." "14.000","Day","Reflectorized Drum With Sequential Flashing Warning Lights","859.1" "1.500","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete For Post Foundation","901.3" "1.000","Ls","Temporary Shoring","950.1" "110.000","Cy","Dumped Riprap","983.01" "80.000","Ton","Riprap","983.1" "1.000","Ls","Control Of Water","991.11" "1.000","Ls","Culvert Structure, Culvert No. Xxx","995.011"

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents