Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Site Utility Distribution System Replacement - Phase II GPC
Infrastructure
Bidding
$2,000,000 est. value
Menomonie, WI 54751

C. Fennimore - T. Castle Rock, US 61 to CTH G
New Construction, Infrastructure
Bidding
WI

Culverts
Term Contract
Post-Bid
WI

Concrete Culverts
Post-Bid
WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

C. Edgerton, South Main Street, City Limit (CTH F) to Lord Street (USH 51); Janesville - Edgerton, W. High Street to Hain Street
Infrastructure
Bidding
WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

STH 57, Ramps with Silver Spring Drive
Infrastructure
Bidding
WI

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Shifflet Road Improvements
Infrastructure
Bidding
Spring Green, WI 53588

2021 Culvert Pipes
Post-Bid
WI

Last Updated 02/01/2022 01:39 PM
Project Title

8th Street South Culvert Rehabilitation

Physical Address View project details and contacts
City, State (County) Wisconsin Rapids, WI 54494   (Wood County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $63,061
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Slip-lining of an existing 44” x 72” arch pipe that conveys stormwater runoff from One-Mile Creek across 8th Street South in Wisconsin Rapids. Proposed underground work includes, but not limited to, removals, excavation/trenching, bypass pumping, installation of proposed slip-lining pipe, construction of cast-in-place structures, salvaging/re-installation of existing 60” RCP storm sewer, installation of new 60” CMP storm sewer (procured and provided by City), backfilling/compaction of all trench/pit areas, and placement and rough-grading of base course for all disturbed parking lots, driveways, paved terraces, sidewalks, and concrete pavement patch areas Major quantities include approximately: 45 LF Remove, Salvage, & Re-Install 60” RCP 40 LF Install 60” CMP Storm Sewer 120 LF Clean & Inspect Existing 44” x 72” CMP Arch Storm Sewer 85 LF Install 45” Equivalent UltraFlo Arch Liner Pipe(Slipline) 35 LF Install 45” Equivalent UltraFlo Arch Liner Pipe(Open-Cut) 682 SY 8” Base Aggregate Dense, 1-1/4” with pavement removal

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents