Similar Projects
Bush Bus Division Building 5 HVAC Equipment Upgrades
Alteration
Bidding
$1,000,000 to $2,500,000 est. value
Baltimore, MD 21230

Light Rail Air Filters
Term Contract
Post-Bid
Baltimore, MD

Emergency Repairs to the Heating Systems at Various HABC Developments
Alteration
Post-Bid
Baltimore, MD

Chiller (HVAC System) Replacement at Windsor Hills Pre K-8 #87
Results
Baltimore, MD 21216

Contractor for Controls Upgrade Project
Results
Baltimore, MD 21201

Smart Chiller Replacememt
Alteration
Post-Bid
Baltimore, MD

AHU Replacement at Thomas Johnson Elementary School 84
Results
Baltimore, MD 21230

On-Call HVAC Repairs and Preventive Maintenance Services
Alteration
Post-Bid

HVAC and Mechanical Equipment Preventative Maintenance and Repair Laurel Readiness Center and FMS
Term Contract
Results
Less than $50,000 est. value
Laurel, MD 20708

HVAC Maintenance and Repairs for MDTA Facilities
Term Contract
Post-Bid
Annapolis, Baltimore, Bel Air, Derwood, Dundalk, Elkton, Laurel, Newburg, Perryville, MD 21226

Replacement of HVAC Units for the 27Th Floor
Results
Less than $100,000 est. value
Baltimore, MD 21202

HVAC Replacement at Locust Point Recreation Center
Alteration
Post-Bid
Baltimore, MD 21230

HVAC and Mechanical Equipment Preventative Maintenance and Repair Fifth Regiment Armory
Term Contract
Results
Baltimore, MD 21201

HVAC Maintenance and Repairs for MDTA Northern and Central Region
Alteration
Post-Bid
Baltimore, MD 21222

VPU HVAC Replacement at Diggs Johnson Building 162
Alteration
Results
Baltimore, MD 21223

Last Updated 05/12/2022 12:31 AM
Project Title

IT Cooling Closet Unit

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21215   (Baltimore City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

a. Unit Replacement - Requesting replacement with a compatible low ambient cooling only system. Install one (1) condenser and four (4) evaporators. Replace existing line sets. Basis of Design System shall be Mitsubishi City Multi, or comparable equivalent. b. Installation - Contractor shall inspect the area for safety hazards, mitigate hazards and ensure all workers are using proper PPE. Contractor shall remove and dispose of all hazardous materials and power off any equipment or controls, as necessary. Contractor shall lock and tag unit out of service and disconnect all control and electrical wiring. Contractor shall provide crane to remove existing chiller from site and set new unit in place. Contractor shall remove and dispose of old unit. Contractor shall clean work site. Contractor shall perform start up, test and check.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents