Similar Projects
Asheville Primary Preschool Renovations and Repairs
Renovation
Conception
Asheville, NC 28806

Hollybrook Park Property Construction
New Construction
Conception
Wendell, NC 27591

Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Ncino Sports Park
New Construction - 2,600 SF
Bidding
$150,000 est. value
Wilmington, NC 28401

Dorothea Dix Park Gipson Play Plaza
Renovation
Bidding
$70,000 est. value
Raleigh, NC 27603

Ballfield Infield Renovations at Valley Springs Park
Renovation
Post-Bid
Durham, NC 27712

Annie Jones, R.S. Dunham and Walnut Street Parks Court Renovations
Renovation
Post-Bid
Cary, NC 27511

Spencer Love Phase 2 Court Expansion Project
Addition
Results
Greensboro, NC 27455

Valdese Lakeside Park Project
Results
Valdese, NC 28690

Woodfield Landing
New Construction
Construction
$13,500,000 est. value
Havelock, NC

Pleasant Park
Construction
Less than $36,000,000 est. value
Apex, NC 27502

Swing Racquet and Paddle
New Construction, Renovation, Alteration - 40,000 SF
Pending Verification
$50,000,000 est. value
Raleigh, NC 27617

Hilltop Needmore Town Park and Preserve Park
New Construction, Renovation
Conception
Fuquay-Varina, NC 27526

Dorothea Dix Park Gateway Plaza And Play
New Construction
Design
Raleigh, NC 27601

Last Updated 06/29/2022 03:07 PM
Project Title

The Commons of Forsyth County Preschool

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27101   (Forsyth County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Park/Playground, Pre-School/Daycare
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a connector building between a two building day care and a playground on the northwest corner of the intersection. Scope details have not been released. As of June 28, 2022 the project is in final design stage. The general contractor has been chosen. Information regarding the architect has not been disclosed. Construction planned to begin in September 2022.

Details

2 Pre-School/Daycare, Renovation, Park/Playground, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents