Similar Projects
CCSWDC Phase III Landfill Expansion
Bidding
$30,000,000 est. value
Sarasota, FL

Design Build - Downtown Solid Waste Enhancement Project
Bidding
Winter Haven, FL

Citizen's Convenience Center at Baseline Landfill
Post-Bid
FL

Section 5 Cell 1A Liner Repair
Post-Bid
FL

Northwest Transfer Facility Improvements (Design Build)
New Construction
Results
Less than $11,500,000 est. value
FL

Venice Household Hazardous Waste Facility Replacement
Results
$425,000 est. value
Venice, FL 34292

Construct an Expansion for the McKay Bay Solid Waste Transfer Station
New Construction - 5,600 SF
Construction
Tampa, FL 33600

East Pasco Transfer Station Expansion
Construction
$7,728,703 est. value
New Port Richey, FL 34654

Operation, Maintenance and Monitoring of the Landfill Gas, Leachate and Stormwater Management Systems at the Orange County Landfill
Term Contract
Bidding
$6,136,824 est. value
Orlando, FL 32829

North Central Landfill Phase VI Expansion 2
Post-Bid
$8,400,000 est. value
FL

Closure of Coyote Navarre C and D Debris Disposal Facility
Results
Less than $4,000,000 est. value
Navarre, FL

West Pasco Resource Recovery Facility Class I Scale House Replacement
New Construction
Construction
FL

New River Regional Landfill Class I Landfill Cell 7 Expansion Construction Landfill Liner Installation
Post-Bid
Raiford, FL 32083

Landfill Alternate Daily Cover
Term Contract
Results
Less than $32,000 est. value
Lecanto, FL 34461

South Dade Landfill Gas System
Post-Bid
$2,166,018 est. value
Homestead, FL 33032

Last Updated 05/01/2020 09:00 AM
Project Title

Operation, Maintenance and Monitoring of the Landfill Gas, Leachate and Stormwater Management Systems at the Orange County Landfill

Physical Address View project details and contacts
City, State (County) Orlando, FL 32829   (Orange County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,420,165
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes all labor, materials, equipment, supervision, quality control, tools, transportation, supplies, and manpower to perform work including, but not limited to, installation and maintenance of horizontal and vertical landfill gas (LFG) collection wells and pipelines, installation and maintenance of stormwater management structures and pipes, installation and maintenance of leachate recirculation system, preparation and submittal of as-built surveys, procurement and placement of sod, and operation, monitoring, and maintenance of the Orange County Landfill LFG and leachate collection and control systems.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Landfill Construction and Storage.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents