Similar Projects
Segoviano Headquarters
New Construction - 12,000 SF
Conception
$3,000,000 est. value
New Albany, IN 47150

Five Guys
Renovation - 2,500 SF
Conception
Bloomington, IN 47404

Shake Shack
New Construction - 2,995 SF
Design
$500,000 to $1,000,000 CJ est. value
Indianapolis, IN 46240

Taco Bell #4977
Renovation - 2,155 SF
Design
Indianapolis, IN 46254

Olive Garden / Greenfield
New Construction, Infrastructure - 6,489 SF
Bidding
$2,000,000 CJ est. value
Greenfield, IN 46140

Pure Green Juice Bar
Build-Out - 1,069 SF
Post-Bid
Carmel, IN 46032

7 Eleven/Roost Chicken #40508
Build-Out
Post-Bid
Elkhart, IN 46514

Jefferson High School Cafeteria and Kitchen Improvements
New Construction
Results
Lafayette, IN 47909

2022 Maintenance Facility
Renovation
Results
Campbellsburg, IN 47108

Office Building and Coffee Shop
New Construction - 6,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fort Wayne, IN

The Madison Mixed-Use Development
New Construction - 54,000 SF
Construction
$83,000,000 est. value
Greenwood, IN

Bombers Bbq Expanding
Build-Out - 5,000 SF
Pending Verification
Crown Point, IN 46307

Grump's Slice Stop
Renovation
Pending Verification
Indianapolis, IN 46205

Waterloo Elementary School Renovation - DeKalb Central School District
New Construction, Infrastructure, Renovation
Conception
$3,383,700 CJ est. value
Waterloo, IN 46793

Taco Bell
Renovation - 2,795 SF
Design
Anderson, IN 46013

Last Updated 06/22/2023 12:13 PM
Project Title

Scooters Coffee Restaurant Development / Peru

Physical Address View project details and contacts
City, State (County) Peru, IN 46970   (Miami County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a 794 square foot restaurant development. As of June 9, 2023, a general contractor has been selected for this project. A firm construction timeline for this project has not yet been determined. This is a negotiated project with Scooters corporate and we are anticipating an August or September 2023 start date. Huff Contracting has built over 60 Scooters stores over the last few years and will continue to build for repeat clients. Scooters construction projects operate on a 8-10 week construction schedule. They are small buildings, but we have a good process that helps all trades get in and out without being stacked on top of each other. We will be looking for quality subcontractors that can show up when we need them and provide a good product with good customer service. Providing a good product, on time, and with a good budget will create additional projects for all of us. Please e-mail bids to Brett@huffcontractinginc.com no later than 6/22/2023. Submitting sooner is greatly appreciated so I can determine where I am short on subcontractor bids. Please review our insurance requirements. If you do not meet our minimum requirements, please factor in a policy change into your bid. All questions should also be e-mailed to Brett@huffcontractinginc.com.

Details

1 Story Above Grade, 794 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents