Similar Projects
Hideaway Lane Condominiums
New Construction
Conception
Ann Arbor, MI 48105

Rose Senior Living - Assisted Living and Independent Living Facilities
New Construction, Renovation, Demolition - 200,514 SF
Conception
Farmington Hills, MI 48336

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Avant Multi-Family Development
New Construction
Design
$30,000,000 est. value
Ann Arbor, MI 48103

Harbor Row Townhomes
New Construction
Post-Bid
Ludington, MI 49431

Comprehensive Maintenance/Vacant Unit Prep Services
Renovation
Post-Bid
River Rouge, MI

Request for Proposals for Purchase and Development of Property
Results
Suttons Bay, MI 49682

Barrier Free Shower Renovation at Three Family Homes
Renovation
Results
Bay City, MI 48708

Cross Creek Condos
Renovation
Construction
Grand Rapids, MI 49508

Square Lake Court Townhomes - Phase I
New Construction
Construction
Troy, MI 48085

Valhalla Ann Arbor
New Construction, Demolition
Pending Verification
$100,000,000 est. value
Ann Arbor, MI 48103

Michigan Avenue Duplexes
New Construction, Renovation
Pending Verification
Alma, MI

Novaplex Townhomes and Apartments
New Construction
Conception
Novi, MI 48374

Crooks Road Townhomes
New Construction
Design
Troy, MI 48084

Chestnut Hills Development: Single Family and Townhomes
New Construction
Post-Bid
Whitmore Lake, MI 48189

Last Updated 10/08/2021 03:24 AM
Project Title

Housing Rehabilitation - Cedar Springs

Physical Address View project details and contacts
City, State (County) Cedar Springs, MI 49319   (Kent County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors on multiple residential projects at 240 Oak Street, Cedar Springs, MI 49319. The project is funded by Kent County Community Development Block Grants (“CDBG”). Project to be completed within 90 days of Notice to Proceed. The scope includes multiple projects. One or multiple may be selected for award; please provide line-item pricing by project. Projects Include: • Lead-based paint requirements • Environmental Rehab RRP requirements • Exterior painting/vinyl siding • Window replacements • Building small roof over rear entrance • Tear off and reroof shingles • Add fill dirt for drainage • Install interior doors • Prepare and paint interior windows with lead-based paint encapsulant • Prepare and paint interior crown molding

Details

Multi-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents