Similar Projects
Well Water System and Repair
Term Contract
Bidding
Santa Fe, NM

Installation of Livestock Well, Livestock Pipeline, Drinking Troughs, Storage Tank and Solar Pumping Plant
Post-Bid
Hernandez, NM 87537

Well Repair (3 and 8)
Post-Bid
Clovis, NM 88101

Drilling and Developing Replacement Water Well 40
Results
$963,498 est. value
Las Cruces, NM

Valle de Oro National Wildlife Refuge Well RG-118-
Results
Albuquerque, NM

Sewage and Trash Pumps, Maintenance and Repair
Term Contract
Post-Bid
Santa Fe, NM

2020 Luna Allotment Wells
Results
$25,000 to $100,000 est. value
Silver City, NM

On Call Well and Pump Services
Post-Bid
Alamogordo, NM

Santa Fe Wells No. 11 & 12 Modifications Construction Contract No. 1
Results
$398,579 est. value
Gallup, NM 87305

Sewage and Trash Pumps, Maintenance and Repair
Post-Bid
Santa Fe, NM

Santa Fe Wells No. 11 & 12 Modifications Construction Contract No. 2
Results
$163,551 est. value
Gallup, NM 87305

New Mexico New Monitoring Wells
New Construction
Post-Bid
Wagon Mound, NM

Green Well (H-1497-POD4) Pump Installation
Results
Ruidoso, NM 88345

Test Wells Pueblo of Laguna
Infrastructure
Post-Bid
Laguna, NM

Construction of the Well 7 and Exploratory Wells
Results
Less than $1,549,396 est. value
Jal, NM 88252

Last Updated 01/06/2022 11:54 AM
Project Title

Anzac Pumphouse Improvements

Physical Address View project details and contacts
City, State (County) Acomita, NM   (Cibola County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Project Delayed, Seeking Funding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing a 26'-8" x 8'-8", two-room pumphouse for Anzac Wells No. 4 5, and 116 LF of 8' high chain link fence. Project includes installation of a well pitless unit, well protection unit and concrete pad at Anzac Well No. 4. The project will include full SCADA electrical and controls to monitor the existing Anzac water storage tank and Anzac Wells No. 4 5. Project also includes installation of new 4" plumbing tree at the Anzac Well No. 6 Pump House.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents