Similar Projects
West Main - Phase I & II
New Construction - 24,000 SF
Design
Flora, MS

The Bella Condominiums
New Construction, Renovation
Design
$20,000,000 est. value
Biloxi, MS 39530

Suncoast Villa Exterior Repairs Biloxi Housing Authority
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Biloxi, MS 39531

Oakwood Village Exterior Repairs
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Biloxi, MS 39530

Demolition and Structural Renovations at Cedars Apartments Units A4, B7, B8
Renovation, Infrastructure
Post-Bid
Natchez, MS

MRHA V - 2020 Phase III UFAS/ADA Renovations
Renovation
Post-Bid
Carthage, Union, Walnut Grove, MS

Bathroom Renovation 2021
Renovation
Results
Okolona, MS

2021 Repairs to Building 215/217 (8 Units)
Renovation
Results
Corinth, MS 38834

City Centre Apartments and Roof Top Bar
Renovation - 34,000 SF
Construction
$9,500,000 est. value
Pascagoula, MS 39567

Grove Street Apartments
Renovation
Construction
Vicksburg, MS 39183

The District On Howard Avenue
Renovation - 250,000 SF
Pending Verification
Biloxi, MS 39530

Vieux Carre Apartments
New Construction
Pending Verification
Jackson, MS

Flowerdale Commons
New Construction
Design
Tupelo, MS 38804

Mcdonnell Exterior Repairs
Renovation, Infrastructure
Bidding
$858,760 CJ est. value
Biloxi, MS 39531

Interior Build-Out at Cedars Apartments Units A4, B7 B8
Build-Out
Post-Bid
Natchez, MS

Last Updated 09/13/2022 01:36 PM
Project Title

2021 Kitchen and Bath Renovations at College Homes 062-004

Physical Address View project details and contacts
City, State (County) Holly Springs, MS 38635   (Marshall County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $429,500 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 13, 2022, this project has not yet been awarded. A timeline for award has not yet been established. A. Visit site prior to bid. Devise a plan for installation of complete and operable electrical systems meeting the requirements and intent of the Contract Documents. Submission of Bid stands as evidence that the Contractor accepts the Contract Documents as sufficient and complete for the work to be performed. Notify the engineer at least two weeks prior to bid of any discrepancies between the Contract Documents and actual field conditions. No change orders will be granted due to existing conditions that could have been observed during a site visit. Questions regarding website registration and online orders please contact Plan House Printing at (662) 407-0193 Contact person for further details is RJZ Architecture, PA (662-226-7115). Robert Zander 662-226-7115 The work will be in one Prime Contract. Each bid must be submitted in duplicate on forms furnished by the Architect and shall be sealed in an envelope. The bid must be accompanied by a certified check or bid bond in an amount not less than 5% of the Base Bid; the successful bidder will be required to furnish and pay for a satisfactory Performance Bond and a Payment Bond in the amount of 100% of the Contract. The Housing Authority of the City of Holly Springs, Holly Springs, Mississippi reserves the right to reject any and all bids or to waive any informalities in the bidding.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents