Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Tolt Pipeline No 1 Rehabilitation
Infrastructure
Bidding
$3,100,000 est. value
Duvall, WA 98019

Water Pump Station Meter and Zone One PRV Replacement
Infrastructure
Bidding
$350,000 to $450,000 est. value
Kennewick, WA 99336

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

SR 224 Van Giesen Improvement Phase One
Infrastructure
Bidding
West Richland, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Badger Canyon Turnout Pipeline Purchase
Infrastructure
Bidding
Kennewick, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Terrace Heights/Treneer Water System Consolidation
Infrastructure
Bidding
$700,000 est. value
WA

Last Updated 11/20/2021 02:03 AM
Project Title

Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Friday Harbor, WA   (San Juan County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves replacing all of the existing 4-inch PVC water main with 4-inch and 2-inch HDPE pipe. The total amount of existing main to be replaced is about 8,300-feet. The total length of new replacement mains will be slightly less at about 8,000-feet because of routing changes. The project includes but is not limited to: 1. Temporary erosion and sediment control around work areas; 2. Installation of new 4-in. HDPE water mains and appurtenances; 3. Replacement or re-connection of existing meters to new service lines; relocation of some meters as shown on plans; installation of new services; 4. Traffic control around work areas; 5. Site Restoration and grading including replacement of asphalt, gravel and landscaping; 6. O&M Manuals; and 7.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents