Last Updated | 12/03/2022 04:31 PM |
Project Title | 2023 Interior Door and Frame Replacement Work at Crestwood School |
Physical Address | View project details and contacts |
City, State (County) | Paris, IL 61944 (Edgar County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $231,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1.2 PROJECT INFORMATION A. Notice to Bidders: bidders may submit bids for project as described in this Document. Submit bids according to the Instructions to Bidders. 1. Regulatory Requirements: AIA Document A701, "Instructions to Bidders" 1997 Edition shall govern submittal, opening, and award of bids. B. Project Identification: 2023 Door Replacement Work at Crestwood School. 1. Project Location: Crestwood School, 15601 U.S. Highway 150, Paris, IL. C. Owner: PARIS CUSD #4. 1. Owner's Representative: Mrs. Danette Young, Superintendent, tel. (217) 465-5391. D. Architect: FGM Architects Inc, 1211 West 22nd Street, Suite 700, Oak Brook, IL 60523. 1. Architect's Representative: Mr. James Andreoni, tel. (630) 272-7430. E. Project Description: Project consists of the replacement of existing interior wood doors, associated frames and hardware and master keying system as indicated in the Bid Documents. F. Construction Contract: Bids will be received for the following Work: 1. Single Prime Contract. No immediate decision will be rendered concerning the proposals submitted. After the bids have tabulated and studied, they will be presented to the School Board at its next regular meeting (November 9, 2022). If only one bid is received on the day of the bid opening, this bid will not be opened but instead will be presented to the School Board at its next regular meeting for consideration. 1.4 BID SECURITY A. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Security shall be either certified check, cashier's check or bid Bond issued by surety licensed to conduct business in the State of Illinois. Owner reserves the right to reject any and all bids and to waive informalities and irregularities Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. 1.7 BID STIPULATIONS A. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond, separate Labour and Material Payment Bond, and Insurance in a form acceptable to Owner. The Performance Bond shall be in the amount of 100 percent of the contract. The performance bond will become a part of the contract. B. The failure of the successful bidder to enter into contract and supply the required bond and Certificates of Insurance within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the Owner may grant, shall constitute a default. C. The Owner reserves the right to accept or reject any or all bids, to waive any informalities and irregularities in any bid, or to make awards in the best interests of the Owner. The Owner also reserves the right to award a partial amount of the Work rather than the entire amount. D. All bids submitted shall be valid for a period of at least sixty days from date of bid opening; the only alterations which will be allowed will be those approved by the Owner. E. All contractors submitting bids must be in compliance with the Prevailing Wage Act as enacted by the State of Illinois. F. As part of their bid, all contractors are required to sign, notarize and return the contractor certificates included with this bid packet. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |