Similar Projects
Asphalt Resurface and Small Structure Replacement
Infrastructure
Bidding
$300,000 est. value
Milan, IN

Asphalt Resurface and Small Structure Replacement
Infrastructure
Bidding
$300,000 est. value
Milan, IN

2020-2 CCMG Paving
Post-Bid
Batesville, IN

2021 Community Crossings Street Improvements
Post-Bid
Osgood, IN 47037

Batesville SR 229 Utility Relocation
Results
Batesville, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Asphalt Resurface
Infrastructure
Bidding
$4,241,003 est. value
Osgood, IN 47037

Quantity Purchase Award (QPA) Agreement for High Density Polyethylene and Profile Wall PVC Pipe Liner
Term Contract
Post-Bid

Tyson Street Resurfacing
Results
Versailles, IN 47042

South Ripley JR-SR HS East Entry Roadway
Infrastructure
Post-Bid
Versailles, IN 47042

Steel Pipe
Infrastructure
Results

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Corrugated Pipe for Dale Subdistrict
Infrastructure
Results

Corrugated Pipe For Washington Subdistrict
Infrastructure
Results

Bike and Pedestrian Facilities
Infrastructure
Results
IN

Last Updated 07/26/2022 02:04 PM
Project Title

South Main Street Resurfacing and Storm Sewer Replacement

Physical Address View project details and contacts
City, State (County) Versailles, IN 47042   (Ripley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $459,735 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 8,200 S.Y. of milling and 1.5" HMA resurfacing overlay with patching of sections as required, the replacement of approximately 760 L.F. of existing storm sewer and driveway culverts, the installation of approximately 1,400 L.F. of new storm sewer, and installation of approximately 680 L.F. of curb along sections of the street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents