Similar Projects
Ellisville Wastewater Plant Expansion
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Valrico Treatment Plant Structural Rehabilitation Project
Renovation
Bidding
$391,236 est. value
Dover, FL 33527

Lime Softening Water Treatment Plant SCADA PLC Hardware Modifications and Filter Control Upgrades
Bidding
$175,000 est. value
Bartow, FL 33830

Privatization of the Wastewater Collection System at U.S. Navy Station Mayport, FL
Post-Bid
Jacksonville, Mayport, FL 32233

Towns Water Treatment Facility (WTF)
Post-Bid
Greenville, FL 32331

General Electrical Design - Substations 9, 10, 11, and 12
Results
Less than $6,430,280 est. value
Miami, FL 33010

Sumterville Water Plant Improvements
Results
Less than $400,000 est. value
Bushnell, Sumterville, FL 33585

RWRF Phase I Plant Improvements
Construction
Less than $6,700,000 est. value
Altamonte Springs, FL

Hodge Street Water Production Facility Upgrades
Construction
$1,970,000 to $2,436,210 est. value
Satsuma, FL 32189

Meadowlake Water Treatment Plant Expansion
Design
Less than $1,686,000 est. value
FL

Replacement of 48in Butterfly Valve and Actuator on Hydrotreaters
Post-Bid
Less than $484,000 est. value
Miami, FL 33173

Doug Allen WRF SBR Improvements
Results
$10,000,000 to $15,000,000 est. value
Bartow, FL 3831

CR 136 / I-75 Water Treatment Plant
Construction
FL

City of Cocoa Chemical Conversion and Reliability Improvements
Post-Bid
Christmas, FL 32709

Last Updated 04/02/2020 08:32 AM
Project Title

Greenland Water Treatment Plant (WTP) - Expansion from 6.0 to 9.0 MGD

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32256   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Construction Commenced, Construction Start Expected April 2020, Construction Completion Expected December 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to construct the expansion to the Greenland WTP. The expansion will include a 2,000 GPM wellhead, a 125 HP High Service Pump, a 1 million gallon Ground Storage Tank and a 750 kW Emergency Generator.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents