Similar Projects
SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Bidding
$500,000 to $20,000,000 est. value

Job Order Contracting Region 1, 4, 7 and 8, 3 and 4, and 5
New Construction
Bidding
$500,000 to $20,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Air Force Contract Augmentation Program (AFCAP) V
Results

Job Order Contracts (JOC) Region B
New Construction, Renovation
Results
$10,000,000 est. value

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

State Wide Job Order Contracting Services
Renovation
Post-Bid

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

Oswego West Arrowhead Breakwater
Renovation
Design
Oswego, NY 13126

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

R2 General Construction & Design-Build Construction Services
Results
Less than $500,000,000 est. value

ERSC MATOC
Post-Bid
$100,000 to $90,000,000 est. value

Last Updated 02/15/2022 12:58 PM
Project Title

Wilbur Hall Corridor Improvements Project

Physical Address View project details and contacts
City, State (County) Oswego, NY   (Oswego County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Reconstruct NE corridor of Wilber Hall to update the following required exit accesses, exits and exit discharges. Exit signs shall be installed and maintained in accordance with the building code.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents