Similar Projects
Tank Lining
Post-Bid
Buffalo, NY 14202

Water Storage Tank Replacement
Post-Bid
Less than $2,350,000 est. value
Pavilion, NY 14525

Water Storage Tank Replacement
Results
Cairo, NY

Gallon Water Tank Rehabilitation
Results
South Glens Falls, NY 12803

FAGE USA New Water Storage Tank Building
New Construction, Renovation
Construction
Johnstown, NY 12095

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Furnish and Install a Submersible Water Storage Tank Mixer and Cathodic Protection System
Post-Bid
Petersburg, NY 12138

Rehabilitation of 100,000 Gallon Elevated Water Storage Tank
Results
Ballston Spa, NY 12020

Lake Water System Improvements Project - Contract No. 3 - Spray Aeration Treatment
Post-Bid
Less than $225,000 est. value
Round Lake, NY 12151

Dover Ridge Water Supply – Water System Improvements
Results
Less than $400,000 est. value
Poughquag, NY 12570

Water Storage Tank Improvement
Post-Bid
Wilson, NY 14172

BPS-2 Water Storage Tank THM Removal System
Results
Watertown, NY 13601

Operable Unit No. 3 - On-Site Structures at the AL Tech Specialty Steel Corp
Post-Bid
$15,000,000 to $20,000,000 est. value
Colonie, NY

Cleaning of Sludge Storage Tanks and Digesters at Yonkers Joint WRRF
Results
Yonkers, NY 10705

Reported 11/25/2020 12:00 AM
Project Title

Fluoride System Upgrade at Reeves Newsom Water Service Station

Physical Address View project details and contacts
City, State (County) Scarsdale, NY 10583   (Westchester County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Removal and replacement of a 2,000-gallon fluoride bulk tank with a new 1,300 gallon bulk tank. 2. Removal and replacement of chemical pumps and double wall piping. 3. Removal and replacement of chemical injection quills and associated chemical supply tubing. 4. Removal and replacement of the bulk tank chamber top slab. 5. Installation of chemical resistive coating in the existing bulk tank chamber. 6. Electrical, Instrumentation, controls, leak sensors, programming, and SCADA modifications. 7. Testing and equipment certification. 8. Site grading/restoration and temporary and permanent vegetation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents