Similar Projects
Chiller Repairs at Wright-Patterson Air Force Base
Design
$5,000,000 to $10,000,000 est. value
Wright Patterson Air Force Base, OH

Partial Roof Replacement, 3 rooftop HVAC units and 4 Boiler Replacements
Bidding
$300,000 est. value
Toledo, OH

Parma #2 Boiler Replacement Boiler Replacement
Bidding
Cleveland, OH

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Replace Hot Water Heating Lines in Weight Room and Gymnasium Sinclair Community College
Post-Bid
Less than $210,000 est. value
Dayton, OH 45390

Domestic Water Heater Replacement
Results
Reynoldsburg, OH

Rebuild Tainter Gate Worm Gearbox
Results
Felicity, OH 45120

Tremont Fountain Improvements
Bidding
Upper Arlington, OH 43221

Hocking Hills State Park - Cabin Water Heater Replacements
Post-Bid
Logan, OH

Y--1B229 Mechanical Room (VA-19-00027342)
Results
$250,000 to $500,000 est. value
Cleveland, OH 44106

Justice Center Water Heater Replacement 2019
Post-Bid
Less than $113,000 est. value
Cincinnati, OH 45202

Stokes Mall Boiler Replacement
Results
$225,000 to $350,000 est. value
OH

Replace Fan Coil Units Building 7 Sinclair Community College
Post-Bid
Less than $130,000 est. value
Centerville, OH

Terminal Boiler Replacement
Results
Cleveland, OH 44135

Boiler and AHU Replacement Lima Fire Department
Post-Bid
Lima, OH

Reported 10/30/2020 12:00 AM
Project Title

WPAFB Replace Cooled Water Lines Building 71D

Physical Address View project details and contacts
City, State (County) Dayton, OH   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed project is to replace deteriorated steel process cooling water pipe system (facilities 71A, 71D, 20, and 20A) and served by cooling towers at facility 21624 (building 71D) with new steel and fiberglass reinforced pipe (FRP) piping. FRP piping shall be for direct bury applications and areas exposed to harsh environments, i.e. existing steam tunnels. Steel piping is preferred in all mechanical room spaces and where maintenance is easily accessed. Replacement of pumps, new Process Automation System controls which includes new control valves, new VFDs, process automation system programming, new Motor Control Center MCC-71D and associated Automatic Transfer Switch (ATS), conduit and miscellaneous control components. - Projects considered similar to this project include but are not limited to: mechanical room renovation or large chiller/HVAC replacement projects, to include demolition and removal of pumps, controls, and insulated carbon steel pipe (underground and tunnels). Projects similar in size to this project include: - Projects similar in size would consist of replacing mechanical equipment supporting multiple cooling towers with 2,000 to 3,250 tons cooling capacity and 3,000 to 4,800 GPM of condenser water flow.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Compressor and Condenser Units, Packaged Air-Cooled Refrigerant Compressor and Condenser Units, Packaged Water-Cooled Refrigerant Compressor and Condenser Units, Refrigerant Condensers, Air-Cooled Refrigerant Condensers, Water-Cooled Refrigerant Condensers, Packaged Water Chillers, Centrifugal Water Chillers, Air-Cooled Centrifugal Water Chillers, Water-Cooled Centrifugal Water Chillers, Cooling Towers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents