Similar Projects
Last Updated | 08/17/2022 01:32 AM |
Project Title | RFP Engineering - Project Development Services |
Physical Address | View project details and contacts |
City, State (County) | Danville, IN 46122 (Hendricks County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $163,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Owner Office Central Office / Dist Project Delivery / Major Project Del Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 9.3% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 Project Development Services I-70 Added Travel Lanes from SR 267 to SR 39 and Interchange Modification at I-70/SR 267 in Hendricks and Morgan Cos. The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents for the listed projects in accordance with INDOTs designated letting schedule. INDOT intends to develop and deliver the project as a Design Build Low Bid (DBLB) project. When necessary and directed by INDOT Project Management, this project might be split into multiple contracts and in part or whole be delivered as Design Bid Build (DBB) project(s). The selected firm shall complete an Engineering Assessment for the interchange project. The selected firm will also be responsible for: AI to the existing Environmental Document (Note; there is an approved CE for the corridor and I-70 ATL from SR 267 to SR 39 was listed as phase 4. Approved CE document is provided as supporting document of this RFP item), Topographic Survey, Design & Plan Development, Hydraulic Analysis, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking), Geotechnical Engineering, Utility and Railroad Coordination, Pavement Design, Traffic Signal Design, Traffic Safety Analysis, Construction Phase Services, and other related services as needed. Additionally, the selected firm will be responsible for providing professional public outreach and marketing services for all construction contracts on this RFP. These services shall compliment INDOTs efforts to proactively communicate project development updates in an effective manner to various media outlets through the consistent utilization of multi-media messaging and visual illustrations as requested. The selected firm shall coordinate with INDOT on all outreach efforts, which may include stakeholder meetings, information meetings, and/or public hearings as deemed appropriate. Other services such as Ecological Surveys, Archaeological Investigations, Historical/Architectural Investigation, and Wetland Mitigation, may be included later if these work types become necessary. The selected firm will be responsible for the Real Estate Acquisition Services (including R/W Management, Appraising, Review Appraising, and Buying) if they become necessary for the project. Please note that the City of Plainfield has released a scoping and alignment study report identifying their priorities which is available at https://www.townofplainfield.com/1722/Scoping-Alignment-Study. The selected firms fee proposal shall be due 45 calendar days after the selection date for this RFP item. These contracts will utilize the INDOT eInvoice application. 2002959 - I 70, Added Travel Lanes, From 0.76 mile W of SR 39 to SR 267, in Hendricks, Morgan Co. RP 058+060 to RP 066+037 - $163,000,000.00 Prequalification Required: Yes The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Project Development Services |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |