Similar Projects
Right of Way - SH152
Infrastructure
Conception
$250,000 CJ est. value
Sayre, OK 73662

Utilities - SH 152
Infrastructure
Design
$272,500 CJ est. value
Sayre, OK 73662

Pavement Rehabilitation - SH 6
Infrastructure
Design
$5,832,299 CJ est. value
Sayre, OK 73662

2022 Sewer Line Replacement Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Erick, OK 73645

Reconstruct Apron
Infrastructure
Post-Bid
$600,000 CJ est. value
Sayre, OK 73662

Bridge Water Proof Seal I-40/I-40 BUS/US-283/SH-5/SH-6/SH-8/SH-33/SH-73
New Construction, Infrastructure
Results

Resurface (UTBWC) - SH-6
Infrastructure
Results
$12,482,685 CJ est. value
Elk City, OK 73644

SH 152 - Utilities
Infrastructure
Design
$327,000 CJ est. value
Sayre, OK 73662

Resurface (Asphalt) - I-40B
Infrastructure
Results
$1,951,370 CJ est. value
Elk City, OK 73662

Widen, Resurface and Bridge - SH 152
Infrastructure
Design
$8,291,947 CJ est. value
Sayre, OK 73662

Widen, Resurface and Bridge - SH 152
Infrastructure
Design
$11,373,124 CJ est. value
Sayre, OK 73662

Utilities - SH 152
Infrastructure
Design
$250,000 CJ est. value
Sayre, OK 73662

Bridge Painting - IS 40
Infrastructure
Design
$817,499 CJ est. value
Sayre, OK 73662

Widen and Resurface - US283
Infrastructure
Design
$7,230,600 CJ est. value
Sayre, OK 73662

Resurface - IS040
Infrastructure
Design
$16,018,200 CJ est. value
Sayre, OK 73662

Last Updated 09/12/2023 04:34 AM
Project Title

Bridge Painting - I-40

Physical Address View project details and contacts
City, State (County) Sayre, OK 73662   (Beckham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,090,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge painting I-40 (westbound): over north fork of red river, 0.5 miles south of the sh-152 junction near sayre. Project length = 0.00 miles Counties: Beckham Calendar Days: 150 Days Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total. OKDOT - 400 -Bridge Painting - I 40 Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. Responses will be posted to the "Pre-bid Questions and Answers" section of the ODOT Contracts & Proposals webpage as they are received. It is recommended that interested contractors visit the "Pre-Bid Questions and Answers" link regularly in order to stay informed of the latest information: https://www.odot.org/contracts.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents