Similar Projects
Gas Meter Replacement: Phase A
Infrastructure
Bidding
$250,000 est. value
Ashland, KY

PAV A 5th Floor Medical Gas Risers
Infrastructure
Bidding
$433,588 est. value
Lexington, KY 40508

Contract No. 2 - KY 875 Gas Main Extension
Post-Bid
Brooksville, KY

Green River Lake Hydraulic Line Replacement
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Campbellsville, KY 42718

SDF Deicing and Fuel Storage Facility
Results
Louisville, KY

External Tank Inspection
Results
Richmond, KY 40475

On and Off Road Fuel
Term Contract, Alteration
Post-Bid
KY

Environmental Operations Tank Inspections And Repairs
Results
Erlanger, KY

Gas Line Replacement
Infrastructure
Post-Bid
Tompkinsville, KY 42167

West Hickman Wet Weather Storage Facility - Phase 2
Infrastructure
Results
Lexington, KY

Dissolved Sulfide Control Treatment
Infrastructure
Post-Bid
Hebron, KY 41048

WTP Ammonia Systems and Sulfuric Acid Upgrades
Infrastructure
Results
Frankfort, KY 40601

Modular Utility Vaults
Infrastructure
Post-Bid
Richmond, KY

Fuel Tanks For Generators
Alteration
Results
Nicholasville, KY 40356

Diesel Duel Fuel Forklift
Infrastructure
Post-Bid
Ashland, KY

Last Updated 06/01/2022 02:28 AM
Project Title

Natural Gas Rehabilitation

Physical Address View project details and contacts
City, State (County) Murray, KY   (Calloway County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Natural Gas Rehabilitation will include the installation of 2-330 linear feet of 6” steel pipeline by HDD, multiple 6” steel hot taps/stops, 2-6” steel valve installations, tie-ins, testing and pigging, directional bores, erosion control and other appurtenances

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents