Similar Projects
McKinley Avenue Improvements - City of Des Moines
Infrastructure, Alteration
Conception
$10,234,933 est. value
Des Moines, IA 50982

Northwest 51th Street - Northwest 62rd to Northwest 64th Avenue - Phase 5 - City of Johnston
Infrastructure
Conception
$2,197,440 est. value
Johnston, IA 50131

Northglen Trail Replacement - City of Johnston -
Alteration
Design
$400,000 est. value
Johnston, IA 50131

2022 HMA Resurfacing Program Contract 1
Infrastructure
Bidding
$1,500,000 CJ est. value
Des Moines, IA 50309

2023 HMA Resurfacing Project
Infrastructure
Bidding
$162,000 CJ est. value
Windsor Heights, IA 50324

Herbicide Application
Term Contract
Sub-Bidding
$25,000 CJ est. value
Des Moines, IA 50309

Herbicide Application
Term Contract
Sub-Bidding
$25,000 CJ est. value
Des Moines, IA 50309

Valley Junction Business District Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA 50265

Sidewalk and Crossing Guard Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA

Crossroads Park Parking Lot and Water Quality Improvements
Infrastructure
Results
West Des Moines, IA 50266

I-235 - Bridge Painting
Infrastructure
Results
IA

70th Street - Meredith Drive to Urbandale Avenue Separated Bike Lanes - ST21-04 - City of Urbandale
Infrastructure, Alteration
Conception
$150,000 est. value
Urbandale, IA 50322

2023 PCC Patching Project
Infrastructure
Bidding
$475,000 CJ est. value
Windsor Heights, IA 50324

Janitorial at Neal Smith NWR Iowa Ppr1022541
Term Contract
Post-Bid
Prairie City, IA 50228

Barrier Rail - I-235
Infrastructure
Results
$177,028 CJ est. value
Des Moines, IA 50312

Last Updated 07/25/2022 11:09 AM
Project Title

Herbicide Application - Brush Management

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50309   (Polk County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Task 1: Foliar Herbicide Application (23 Acres) Description: Contractor must apply Garlon 3A or the generic equivalent pre-approved by the DNR Project Manager to the trees outlined in orange on Attachment A. Tree density in this area ranges from around 5% to 15% cover, and trees are approximately 3 to 8 foot tall with a less than 2 in dbh. o Foliar spray mix must consist of at least a 2% solution of triclopyr and a non-ionic surfactant containing a penetrant. Rate of surfactant must be per the label recommendations. o Sufficient spray volume should be used to obtain complete coverage of the target plant foliage. o 1 week after initial herbicide application, Contractor must complete a follow-up pass of herbicide application to treat any trees that were missed in the initial application. Task 2: Brush Management (3 Acres) Description: Contractor must remove woody species in the treatment area outlined in red on Attachment A. Woody species can be removed by mulching with a forestry mulcher, cutting at the base, or other pre-approved methods of mechanical removal. Tree density in this area ranges from around 40% to 50% cover, and trees are approximately 12 to 15 foot tall with a 2 to 4 in dbh. o Undesirable woody species must be removed to ground level. Task 3: Follow-Up Herbicide Application (3 Acres) Description: Contractor shall apply herbicide to undesirable woody species that were mechanically removed in Task 2. The area of treatment is outlined in red on Attachment A. o If the contractor cuts the trees at their base, the stumps must be immediately treated with Garlon 3A or an approved equivalent. o If the contractor mulches the trees, the resprouts must be treated with Garlon 3A the following growing season (August 1st to September 1st, 2023). o Herbicide must be applied at the labeled rate for the method of application used. DNR Issuing Officer: Philip Payton 502 E 9th Street Des Moines, Iowa 50319 515-361-0743 philip.payton@dnr.iowa.gov RFQ written questions, requests for clarification, and suggested changes from Respondents are due: 7/25/2022 at 4:30pm DNR's written response to RFQ questions, requests for clarifications, and suggested changes are due: 7/27/2022 at 4:30pm Tentative Contract term start date: August 1, 2022 Tentative Contract term end date: December 1, 2023 RFQ written questions, requests for clarification, and suggested changes from Respondents are due: July 25th, 2022 DNR's written response to RFQ questions, requests for clarifications, and suggested changes are due: July 27th, 2022 Anticipated Date to Issue Notice of Intent to Award: July 29th, 2022 Anticipated Date to Execute Contract: August 1, 2022 The DNR reserves the right to reject any or all Bids received in response to this RFQ, cancel this RFQ, or advertise a new RFQ at any time prior to the execution of the Contract. Issuance of this RFQ in no way constitutes a commitment by the DNR to award a contract.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents