Similar Projects
Last Updated | 02/16/2023 01:37 AM |
Project Title | Purchase and Installation of Picnic Shelter for Newman Park |
Physical Address | View project details and contacts |
City, State (County) | Henderson, KY 42420 (Henderson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $35,110 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Purchase & Installation of Picnic Shelter for Newman Park. The City of Henderson reserves the right to reject any and all bids and to waive irregularities in said bids. - The shelter shall cover an area approximately 200 sq ft. - The roofwill provide a minimum of 8' clearance at its lowest point. - The shelter will meet all applicable KY building code requirements. - The Shelter will be rated for a wind gust speed of 100 mph minimum and 15 pounds ofsnow load. - The shelter roofwill be a pitched standing seam metal roof. - The shelter roofwill be a minimum of 24-gauge metal attached directly to the shelter frame -The columns, truss tail and side beams shall be powder coated. - All columns, beams, and rafters shall be tube steel. - The columns shall possess plates at the bottom capable of being bolted to a concrete foundation. Anchor bolts shall be included by the vendor. - The vendor will provide color options for the roof and columns. - The vendor will supply KY signed and sealed engineering plans (drawings), including footers ifnecessary. - The vendor will ship the shelter in a "knocked down" configuration. - The shelter will be delivered pre-engineered and pre-cut and include all parts necessaiy for field construction. - The owner will offload and store until installation - The Vendor will provide all materials, equipment, and labor for installation ofthe foundation, footers, if necessary, shelter and roof. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |