Similar Projects
Track and Tennis Repairs
Infrastructure
Bidding
$240,000 est. value
West Newbury, MA 01985

Resurfacing of Various Basketball Courts
Post-Bid
Less than $75,000 est. value
Salem, MA

Installation of Bituminous Asphalt at Memorial Park Playground
Post-Bid
Less than $40,000 est. value
Salem, MA 01970

Twi Field / Infield Renovations
Results
Less than $40,000 est. value
Danvers, MA

Bertram Field Phase II Project (Salem High School Field Renovation) - General Bid
Results
Less than $4,722,503 est. value
Salem, MA 01970

Traders Way
New Construction - 53,200 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Salem, MA 01970

Flash Road Basketball and Tennis Court Replacement
Post-Bid
Less than $245,000 est. value
Nahant, MA

Bertram Field Phase II Project (Salem High School Field Renovation) - Sub Bids
Results
Less than $4,722,503 est. value
Salem, MA 01970

Installation of Playground Equipment and Rubberized Surfacing at Memorial Park Playground
Post-Bid
Less than $40,000 est. value
Salem, MA 01970

Greater Lawrence Technical High School Athletic Campus Improvements Phase 3
Results
$650,000 to $700,000 est. value
Andover, MA 01810

Palmer Cove Park Renovations - Phase 1
Post-Bid
Less than $995,000 est. value
Salem, MA 01970

Indian Ridge Playground Project
Results
Less than $300,000 est. value
Andover, MA 01810

Central Street Athletic Fields Basketball Court Construction
Post-Bid
Less than $100,000 est. value
Byfield, MA

Mt Vernon Park Playground
Results
Lawrence, MA 01843

Salem Willows Phase 1 Improvements
Post-Bid
Less than $1,750,000 est. value
Salem, MA 01970

Last Updated 06/30/2021 10:00 AM
Project Title

High Plain Elementary School Kindergarten Playground Renovation

Physical Address View project details and contacts
City, State (County) Andover, MA 01810   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $223,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of New playground equipment with rubber safety surfacing including demolition of existing playground equipment, asphalt pavement and painted pavement games

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents