Similar Projects
Swimming Pool Filtration System Improvements
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Trenton, IL 62293

Lakeside Villas
New Construction, Infrastructure - 24,794 SF
Sub-Bidding
$9,000,000 CJ est. value
Carlyle, IL 62231

Road Improvements
Post-Bid
Breese, IL

Asphalt Paving
Post-Bid
Carlyle, IL

Crack and Joint Sealing on IL 127 from The Bond County Line to 0.2 Miles North of Williams Road
Results
Albers, IL 62215

Patching at Various Locations throughout District 8
Infrastructure
Results

2022 High School Partial Pavement Replacement
Infrastructure
Construction
$31,450 CJ est. value
Trenton, IL 62293

2022 High School Partial Pavement Replacement
Infrastructure
Construction
$31,450 CJ est. value
Trenton, IL 62293

Road Improvements
Infrastructure
Post-Bid
New Baden, IL

0.8 Miles of Bureau Of Research Test Pavement Alongside Us 50 from Crackerneck Road to Russland Road
Infrastructure
Results
IL 62293

Seal Coat Aggregate
Infrastructure
Post-Bid
New Baden, IL

Roadway Paving
Infrastructure
Results
$52,227 est. value
Aviston, IL

Pavement Surface Removal
Infrastructure
Post-Bid
Trenton, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Blackberry Run Improvements
Infrastructure
Post-Bid
Centralia, IL

Last Updated 09/08/2022 11:36 AM
Project Title

Parkview Manor Detention Pond Improvements

Physical Address View project details and contacts
City, State (County) Albers, IL 62215   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Location: The project is located on the north side of Park Avenue, just west of Cottonwood Drive in Albers, IL. The project will consist of improving an existing retention pond to a seeded dry bottom detention area. It will include existing riprap removal, furnished excavation, construction of a concrete gutter, replacing the CMP outfall pipe, and seeding the construction area. State prevailing wage rates apply. IDOT prequalification is not required.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents