Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

PA 711 Crawford Ave Bridge
Demolition, New Construction, Infrastructure
Design
$10,051,000 CJ est. value
Connellsville, PA 15425

PA 711 Crawford Ave Bridge
Demolition, New Construction, Infrastructure
Design
$10,051,000 CJ est. value
Connellsville, PA 15425

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Liberty Hall Sanitary Sewer Replacement Project
Infrastructure
Bidding
$1,200,000 CJ est. value
Fairchance, PA 15436

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Asphalt Seal Coat
Infrastructure
Post-Bid
Vanderbilt, PA

Spruce Hollow Road Reconstruction in Bullskin Township
Infrastructure
Results
Connellsville, PA 15425

Lemont Furnace Area II Road Reconstruction (Storm Sewers)
Infrastructure
Results
Uniontown, PA

Main Street Improvement Project - Masontown Borough
Infrastructure
Pending Verification
$2,500,000 CJ est. value
Masontown, PA 15461

Main Street Improvement Project - Masontown Borough
Infrastructure
Pending Verification
$2,500,000 CJ est. value
Masontown, PA 15461

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

2023 Bridge Deck Preservation
Infrastructure
Bidding
$5,000,000 CJ est. value
South Union Township, PA 15445

Last Updated 02/24/2023 10:48 AM
Project Title

General Construction Campground Full Service Sites the Ol' Predicament Loop Ohiopyle State Park Stewart

Physical Address View project details and contacts
City, State (County) Ohiopyle, PA 15470   (Fayette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,812,317 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work included under this contract consists of general construction of full service campground sites at Ohiopyle State Park. The work includes but is not necessarily limited to site work including erosion and sediment control, demolition, storm drainage installation, paving with various materials, utility work, landscaping and other associated work as indicated on the Contract Drawings. Submit questions regarding the technical specifications and/or the drawings to Jennifer Rodgers, PE at jrodgers@larsondesigngroup.com or 570-244-3378. All other questions shall be directed to the Construction Management Section at RA-NRFDC_CONTRACTING@pa.gov. SDB VBE 9% 3%

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents