Similar Projects
A/C Compressor Overhaul Services
Alteration
Bidding
Pasadena, TX

HVAC Replacements for Coleman College
Alteration
Bidding
$975,000 to $1,125,000 est. value
Houston, TX 77030

Air Filter Media
Term Contract
Post-Bid
Deer Park, TX 77536

HVAC Maintenance USCG Air Station Houston
Post-Bid
Houston, TX

Replacement and Installation of Heating, Ventilation and Air Conditioning System at the Youth Village
Results
Less than $600,000 est. value
Seabrook, TX 77586

Four (4) Liebert Air Handling Units Replacement at Houston Air Traffic Control Tower (IAH ATCT)
Results
Less than $150,000 est. value
Houston, TX 77032

Air-Handling Units at 1111 Fannin Street for Harris County Facilities and Property Maintenance
Alteration
Bidding
Houston, TX 77002

HVAC Modification at the North Harris Lone Star College Campus
Post-Bid
Houston, TX 77073

Duct Bank-William P. Hobby Airport
Results
Less than $100,000 est. value
Houston, TX 77061

ESSER Air Filtration Project
Term Contract
Bidding
Houston, TX

Heating, Ventilation, and Air Conditioning Services
Term Contract
Post-Bid
Houston, TX 77251

Replacement of HVAC at Ewing Apartments
Results
Less than $151,002 est. value
Houston, TX 77004

ROC Rooftop Unit Replacement
Post-Bid
Houston, TX 77030

Cuney Homes Heater Replacement
Results
Less than $570,606 est. value
Houston, TX 77004

HVAC Bundle
Post-Bid
Baytown, TX

Last Updated 12/29/2021 11:21 AM
Project Title

Backup Chiller for Transportation Center, C.26

Physical Address View project details and contacts
City, State (County) Houston, South Houston, TX 77089   (Harris County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall install owner furnished air-cooled chillers CH-2 and CH-3 and provide the following: 1. New housekeeping pads, 2. Pipe supports and stanchions for hydronic piping, 3. Chilled water piping including manual isolation valves, thermometers, etc., as indicated, and 4. Control devices, wiring, programming, and graphics associated with new and existing air-cooled chillers. Contractor shall also extend power to new air-cooled chillers from existing panel ‘CH-H’ and provide the following: 1. New circuit breakers, wiring and conduit as indicated, 2. New exterior light fixtures and receptacles, 3. Feed from existing circuit breakers in panel ‘CH-L’, 4. New conduit and wiring as indicated, 5. 120 V power for controls from existing circuit breaker in panel ‘CH-L’ as indicated.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents