Similar Projects
Sewer Cleaning and Maintenance Services
Term Contract
Bidding
Santa Clara, CA

Sanitary Sewer Condition Assessment FY 2021-2022 Package III
Infrastructure
Bidding
$839,305 est. value
San Jose, CA

On Call Service Contract for Water and Sewer Utility Repairs
Term Contract
Post-Bid
Santa Clara, CA

CHP Gilroy CVEF Northbound Septic Pumping Services
Infrastructure
Post-Bid
San Martin, CA 95046

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Miscellaneous Sanitary Sewer Repairs FY 20-21 (Package III)
Infrastructure
Results
$700,001 to $800,000 est. value
San Jose, CA

Masten Septic Tank Replacement
Infrastructure
Bidding
$25,000 est. value
Gilroy, San Jose, CA 95020

Sanitary Sewer Condition Assessment FY 2021-2022 Package I
Infrastructure
Post-Bid
$854,557 est. value
San Jose, CA

Cast Iron Sanitary Sewer Replacement FY 2020-2021 Package III
Infrastructure
Results
San Jose, CA

Sanitary Sewer Repairs FY 2021-2022 Package II
Infrastructure
Post-Bid
$778,316 est. value
San Jose, CA

Miscellaneous Sanitary Sewer Repairs FY 2020-2021 (Package II)
Infrastructure
Results
$949,880 est. value
San Jose, CA

Sanitary Sewer Condition Assessment FY 2021-2022 Package IV
Infrastructure
Post-Bid
$830,900 est. value
San Jose, CA

Sanitary Sewer Main Replacement 2021
Infrastructure
Results
$3,859,872 est. value
Sunnyvale, CA

On-Call Sanitary Sewer Spot Repairs and CCTV Inspection Services
Infrastructure
Post-Bid
Los Altos, CA

Sanitary Sewer Condition Assessment Package Two
Infrastructure
Results
$874,512 est. value
San Jose, CA

Last Updated 06/15/2022 08:01 AM
Project Title

Cast Iron Sewer Replacement FY 2021-2022 Package I

Physical Address View project details and contacts
City, State (County) San Jose, CA   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $804,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this contract consists of, in general, but not limited to removal of 6-inch and 8-inch diameter cast iron pipe (CI), the installation of 6-inch and 8-inch ductile iron pipe (DIP), and the installation of 6-inch diameter vitrified clay pipe (VCP). This project also includes the removal of a sanitary sewer manhole and flushing inlet, the rehabilitation of existing and construction of a new sanitary sewer manhole and the evaluation, repair and reconnection of sanitary sewer service laterals.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents