Similar Projects
Replace Ice Bank Controls - Stocking Hall East
Renovation
Conception
Ithaca, NY 14853

Student & Campus Life Code Remediation Phase 3A
Renovation
Bidding
$575,000 to $600,000 est. value
Ithaca, NY 14850

Baker Lab Roof Replacement
Renovation
Post-Bid
$200,000 to $230,000 est. value
Ithaca, NY 14882

Uris Hall Elevator Modernization
Renovation - 1,380 SF
Post-Bid
$1,700,000 to $1,750,000 est. value
Ithaca, NY 14853

Construction Manager Term Agreement - North Region
Term Contract
Results

Construction Manager Term Agreement - South Region
Term Contract
Results

Bradfield Hall Lab G15 Renovation
Renovation - 728 SF
Construction
$366,000 est. value
Ithaca, NY 14853

Clark Hall 1st Floor Renovations Applied & Engineering Physics
Renovation
Construction
$190,000 to $230,000 est. value
Ithaca, NY 14853

Replacement of HVAC systems in Stocking Hall East at Cornell University - Consultant Services
Renovation - 7,000 SF
Post-Bid
Ithaca, NY 14853

Willard Straight Hall Freight Elevator Replacement & Interior Renovations
Renovation - 2,000 SF
Construction
$2,400,000 est. value
Ithaca, NY 14853

Delta Upsilon Interior Improvements - Phase 4 - First Floor Restroom
Renovation - 270 SF
Post-Bid
$150,000 to $175,000 est. value
Ithaca, NY 14850

Bradfield Hall Rehabilitation / System Upgrades
Renovation
Construction
$12,815,000 est. value
Ithaca, NY 14853

Appel Dining Hall Second and Third Floors Renovation
Renovation
Post-Bid
$2,200,000 to $2,300,000 est. value
Ithaca, NY 14850

Snee Hall Renovation For Colocation Of EAS
Renovation - 10,225 SF
Construction
$938,700 est. value
Ithaca, NY 14850

Anabel Taylor Hall Roof Replacement
Renovation
Post-Bid
$1,000,000 to $1,250,000 est. value
Ithaca, NY 14850

Last Updated 11/02/2021 03:00 PM
Project Title

Bard Hall Code Improvements

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14853   (Tompkins County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced September 2020, Construction Complete as of October 2021
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Selective abatement and demolition including an existing exterior fire escape, a steel framed mezzanine, non-loadbearing partitions, doors/frames, flooring, miscellaneous finishes, and identified M/E/P items. Provide a new enclosed egress stair, constructed of pile foundations and precast concrete walls and stairs, that will serve the first, second, third, and fourth/roof levels. Creation of 2-hour rated MEP pipe chases within the existing stair enclosure that serves both Bard and Thurston. Increase the partition rating at the first-floor lobby of Bard Hall to provide a 2-hour rating for the discharge of the existing stair that serves both Bard and Thurston. Provide a make-up air unit on the roof to pressurize an existing stair. Firestopping of existing penetrations in rated walls. Provide a second means of egress from Lecture Hall Room 140 directly to the exterior with an exterior landing and stair; includes the replacement of an existing window unit with a window and door unit. Miscellaneous ceiling work to accomplish the work above ceilings. Miscellaneous. spray-on-fireproofing of unprotected steel within Bard Hall. Provide corridor eyewash guards. Provide an automatic sprinkler system throughout the entire Bard Hall, Thurston Hall and identified areas of Kimball Hall to result in a fully sprinklered building. Provide standpipe in new stair and sanitary drain to existing sanitary manhole (for drain riser). Replace existing steel water supply main in Thurston Hall. Replace HVAC controls and air valves in Bard Hall. Replace the existing fire alarm control panel with new for the building, reconnect existing addressable devices, provide some new FA devices and replace non-addressable devices. Provide site modifications and restoration in the areas of work.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents