Similar Projects
Water System Improvements
New Construction
Bidding
$9,255,000 est. value
Fairmont, WV 26554

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Water System Improvements
Post-Bid
Less than $1,921,000 est. value
Augusta, WV 26704

Replace Product Recovery Tank
Results
$250,000 to $500,000 est. value
Martinsburg, WV 25405

Proposed Tank Replacement - Contract 2
Post-Bid
Paden City, WV 26157

Water Storage Tank Upgrades
Results
McMechen, WV

Contract #2 – Tank Upgrades
Results
Clarksburg, WV 26422

Cumberland Heights Water Storage Tank
Results
New Cumberland, WV

Contract 2 - Water Tank Rehabilitation
Results
Cowen, WV

Last Updated 04/06/2021 03:30 PM
Project Title

Water System Improvements - Cut Off Water Storage Tank and Pump Station - Contract 3

Physical Address View project details and contacts
City, State (County) New Creek, WV 26743   (Mineral County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $842,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Audio Visual Taping; 520 LF of PVC Water Line;; 1 Valve Vault; 5 Valves w/Valve Boxes; Access Road and Tank Site Preparation; Water Storage Tank; Pump Station;; 1,300 SF of Retaining Wall; 560 LF of 6-ft Chain Link Fence w/Barbed Wire; 12-ft wide Chain Link Fence with 3 strand barbed wire; existing water tank and pump station demolition; and all other necessary work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents