Similar Projects
Site Gas Distribution Plan
Infrastructure
Bidding
Sloatsburg, NY 10974

Maintenance of Propane System
Alteration
Bidding
Arkville, NY

Replacement of Natural Gas Piping at Carpenter Avenue Apartments
Post-Bid
Mount Kisco, NY 10549

Construction of a Shared-Use Fuel Facility
Post-Bid
Ithaca, NY 14850

Roosevelt High School Gas Utility Upgrade Project
Results
Less than $450,000 est. value
Yonkers, NY 10710

Reactor Tank Cleaning
Results
Buffalo, NY 14202

Kenmore Mercy Hospital - Fuel Tank-Generator Replacement
Construction
Kenmore, NY 14217

Town Wide Storage Tank Rehabilitation and New Tank Construction-Glass Lined Carmel 2,3,8 and14
Alteration
Bidding
Carmel, NY

Tank Tightness Testing
Term Contract
Post-Bid
Mayville, NY 14757

Remove/Replace Fuel Oil Tanks at Fishkill CF
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Beacon, NY 12508

Water Supply Contract 5A - Village of Oakfield Water Storage Tank GC Phase 2
Alteration
Bidding
Less than $200,000 est. value
Oakfield, NY

Maintenance, Repair and Inspection of Petroleum Product Tanks, Pumps and Other Related Equipment
Post-Bid
Poughkeepsie, NY 12601

Underground Fuel Tank Replacement
Results
Schenectady, NY 12305

Acid and Water Waste Tank Pumping
Post-Bid
South Glens Falls, NY 12803

Oil Tank Electronic Monitoring Systems and Oil Tank Repair Service, Maintenance and Repair
Term Contract
Results
White Plains, NY 10603

Last Updated 06/16/2021 04:57 PM
Project Title

Oil - Water Separator Replacement

Physical Address View project details and contacts
City, State (County) Syracuse, NY   (Onondaga County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Location: Oswego County Highway Department, 31 Schaad Drive, Scriba, New York 13126 The Project consists of the replacement of the existing oil-water separators and associated piping and site work at the Parish and Scriba Highway Garage facilities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Division 46 - Water and Wastewater Equipment, Oil and Grease Separation and Removal Equipment, API Oil-Water Separators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents