Similar Projects
CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE
Renovation, Alteration
Design
CA

CA ERFO KLAMATH NF 17N11(1) Upper Doolittle & Mill Creek Bridges
Renovation, Infrastructure
Design
Apple Valley, Happy Camp, CA 96039

Rectangular Rapid Flashing Beacon Installation
Infrastructure
Bidding
Less than $225,000 est. value
Stockton, CA

Remove and Place Thermoplastic Traffic Stripe With Micro-Surfacing
Infrastructure
Bidding
$1,230,000 est. value
CA

Soundwall Repair and Replacement Services
Infrastructure
Post-Bid
$200,000 est. value
San Jose, CA

Rectangular Rapid Flashing Beacon Project
Infrastructure
Post-Bid
$200,000 est. value
Suisun City, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

2020 LNU Fire FHWA Guardrail Replacement Project
Infrastructure
Results
$1,800,000 est. value
CA

Guardrail Services in Los Angeles County
Infrastructure
Bidding
CA

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Post-Bid
Victorville, CA

CZU Lightning Complex Guardrail Replacement Project
Infrastructure
Results
$600,027 est. value
Santa Cruz, CA

SB Minor B Revise Striping and Place Rumble Strip
Infrastructure
Bidding
$297,000 est. value
CA

Hood Los Alamos Entry Retaining Walls
Infrastructure
Post-Bid
Santa Rosa, CA 95409

Raised Median At El Dorado Street
Infrastructure
Results
Stockton, CA

Pavement Maintenance and Repairs
Alteration
Bidding
$700,000 to $800,000 est. value
Solana Beach, CA

Reported 02/03/2022 12:00 AM
Project Title

HCTP Retaining Wall

Physical Address View project details and contacts
City, State (County) Thousand Oaks, CA   (Ventura County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, labor, supplies, and manufactured articles as required by the plans (Drawing Number 20-23A, Sheets 1-10), Specifications, and Contract Documents. The Project scope of work is to remove an existing retaining wall structure, install a replacement soldier pile and timber lagging retaining wall, excavation and grading, storm water conveyance facilitties, utility relocations and abandonments and chain link fencing installation., It shall also include the furnishing of all transportation and service, including fuel, power, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents, per specifications.

Details

Division 32 - Exterior Improvements, Retaining Walls.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents