Similar Projects
Fire Door Repairs
Bidding
San Antonio, TX

Overhead Door Maintenance San Antonio District
Term Contract
Post-Bid
San Antonio, TX 78229

Krier Center Door Replacement/Canopy Project
Post-Bid
San Antonio, TX 78223

ATC Tower Glass Replacement
Results
San Antonio, TX 78234

Replace SCIF Doors
Results
$25,000 to $100,000 est. value
San Antonio, TX 78253

John Peace Library (JPL) Replace Exterior with Windows
Post-Bid
$2,000,000 est. value
San Antonio, TX 78275

Locksmith Services for Region 08 Offices
Term Contract
Results
Austin, TX

San Antonio Babcock AO - Refresh Interior, Doors
Post-Bid
San Antonio, TX 78201

2020 Door Hardware Project
Results
Less than $780,000 est. value
San Antonio, TX 78249

Annual Contract for Overhead Door Repairs for the San Antonio Fire Department
Term Contract
Results
San Antonio, TX 78283

Construction of Door of Equality Art Structure
Results
San Antonio, TX 78204

Job Order Contract (JOC) for as Needed Commercial Glass Repairs and Renovations
Results
$75,000 est. value
San Antonio, TX 78200

Purchase and Installation of Overhead Door Operators at Saws Steven M Clouse Recycle Center Fleet Building
Results
San Antonio, TX 78212

Human Resources Security Upgrades
Results
Less than $49,646 est. value
San Antonio, TX 78204

Annual Contract for Building Glass Maintenance and Replacement
Term Contract
Results
San Antonio, TX 78283

Reported 01/30/2020 12:00 AM
Project Title

Terminal A Renovation Phase III, Front Door Modernization

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78216   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of San Antonio, Transportation & Capital Improvements Department on behalf of the Aviation Department. Is seeking qualifications and Request for Competitive Sealed Proposals from qualified firm(s) to provide construction services for the Terminal A Renovation Phase III, Front Door Modernization Project. Contractor’s scope of work provides for a front door modernization to be performed at Terminal A and B at the San Antonio International Airport. . A brief summary is listed below: 1. Modifications to the roadway passenger loading zones to improve ADA at Terminal A and B. 2. Removal of existing commercial lane awnings and addition of steel & fabric tensile canopies. 3. Demolition and addition of exterior light fixtures at Terminal A and B. 4. Replacement of pedestrian barrier fencing at the commercial sidewalk. 5. Demolition of existing vestibule canopies and roofs at the upper level of Terminal A. 6. Addition of vestibule canopies and roofs at the upper level of Terminal A. 7. Replacement of exterior terrazzo flooring with concrete flatwork at both levels of Terminal A.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents