Similar Projects
Darn Tough Socks
Build-Out - 72,000 SF
Conception
Waterbury, VT 05676

Handy GMC Buick
New Construction, Addition - 43,100 SF
Conception
$706,500 est. value
Saint Albans, VT 05478

Burlington Town Center Mall Redevelopment - CityPlace
New Construction - 763,200 SF
Design
$10,000,000 CJ est. value
Burlington, VT 05401

GW Plastics
New Construction
Design
Bethel, VT 05068

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Bidding
$150,000 est. value

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Bidding
$150,000 est. value

Newbury Elementary School Drainage/ Grading Work and Concrete Wall Replacement
Post-Bid
Newbury, VT 05051

Healthy Living Grocery Store
New Construction - 18,057 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Shelburne, VT

Castleton STP 0161 (35)
Results
$250,000 to $500,000 est. value
Castleton, VT 05735

CEATS Red House Site Improvements
Results
Jericho, VT

Rye Meadow
New Construction - 1,247,144 SF
Construction
$7,291,740 est. value
South Burlington, VT 05403

Rye Meadow
New Construction - 1,247,144 SF
Construction
$7,291,740 est. value
South Burlington, VT 05403

110 Gage Street
New Construction
Pending Verification
Bennington, VT 05201

Burger King
Renovation
Pending Verification
Less than $750,000 est. value
Brattleboro, VT 05301

Office Building
New Construction - 2,600 SF
Conception
$297,000 est. value
Brookfield, VT 05036

Last Updated 03/24/2021 01:51 PM
Project Title

Simpson Temple Campground

Physical Address View project details and contacts
City, State (County) Lyndon, VT 05832   (Caledonia County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Office, Restroom/Bath House, Site Development, Supermarket/Convenience Store
Contracting Method Owner to Subcontract.
Project Status Construction Commenced third quarter 2019, Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $165,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Office, 2,100 SF New Construction, 1 Supermarket/Convenience Store, New Construction, 1 Restroom/Bath House, New Construction, Site Development, New Construction, 138 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents