Similar Projects
Lexington Estates - Phase 2A
New Construction - 30,240 SF
Conception
York Haven, PA 17370

Sussex Place - Phase 1
New Construction - 33,725 SF
Conception
York, PA 17408

Strawberry Field Estates
New Construction - 240,000 SF
Design
York, PA 17408

Northfield
New Construction - 114,000 SF
Design
$20,000,000 to $30,000,000 est. value
York, PA 17402

Development Partners
Results
York, PA

Stonewick Development
New Construction - 465,600 SF
Construction
$10,000,000 CJ est. value
Hanover, PA 1331

Ravencliff Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Stewartstown, PA 17363

Whitetail Ridge - Phase 2
New Construction - 9,925 SF
Conception
Hanover, PA 17331

Boyd Development
New Construction
Design
York, PA 17315

Hamilton Overlook
New Construction - 195,000 SF
Construction
Glen Rock, PA 17361

Stonewicke - Phase 1
New Construction - 85,500 SF
Design
$25,000,000 to $30,000,000 est. value
Hanover, PA 17331

Mustang Point
New Construction - 450,000 SF
Construction
$50,000,000 est. value
Hanover, PA 17331

Summerset Meadows - Phase 2
New Construction - 50,141 SF
Design
$7,000,000 to $8,000,000 est. value
York, PA 17406

Fox Run
New Construction - 50,000 SF
Construction
$8,000,000 est. value
Hanover, PA 17331

Taylor Estates
New Construction - 6,000 SF
Design
York, PA 17404

Last Updated 01/28/2019 11:47 AM
Project Title

Ware Presbyterian Village

Physical Address View project details and contacts
City, State (County) Dillsburg, PA 17019   (York County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility, Single-Family Homes
Contracting Method Bids by Invitation.
Project Status Seeking Site Plan Approvals, Design Development, Construction Start Expected May 2018
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details ,, 15,278 SF - 1 Assisted Living Facility, 13,078 SF New Construction, 2 Single-Family Homes, Approximately 2,200 SF New Construction, 33.90 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents