Similar Projects
Design-Builder Clear Springs Ranch Resource Recovery Facility Biogas Utilization
New Construction
Bidding
CO

Wastwater Treatment Plant Expansion Project
Renovation
Bidding
Crested Butte, CO

Total Organic Carbon (TOC) Analyzer for Water Reclamation Facility
Post-Bid
Pueblo, CO

Sterling Wastewater System Improvements Bid Package 100 Headworks and Influent Pump Station
Post-Bid
$5,000,000 to $7,000,000 est. value
Sterling, CO

Peetz Wastewater Treatment Facility
Results
$1,500,000 to $2,000,000 est. value
Peetz, CO 80747

Center Sanitation District Wastewater Treatment Plant Improvements
Results
Lakewood, CO

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Harold D. Thompson Wastewater Treatment Facility (HDT) - Aeration Basin 3 - Biological Nutrient Removal (BNR)
Renovation
Construction
Fountain, CO

PMAA-2022-HPSF-Onsite Wastewater Treatment System
New Construction, Infrastructure
Bidding
CO

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

ERMD New Sewage Treatment Plant
Results
$6,000,000 to $7,000,000 est. value
Durango, CO 81301

Equipment Pre-Selection Central Wastewater Treatment Plan Project: Johnstown
Infrastructure
Bidding
Johnstown, CO

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

191024A/Foothills Chill Plant - Bid Package 1 - Civil
Results
$732,750 est. value
Fort Collins, CO 80523

Collection System Waste Receiving Station at Northglenn WWTP
Infrastructure
Bidding
Northglenn, CO

Last Updated 01/27/2022 03:55 AM
Project Title

Construction of Oak Meadows On-Site Wastewater Treatment and Restroom Renovation

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80921   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes the installation of a septic tank, pumping chamber, and a new soil treatment area. The existing composting toilet system will be removed from the Oak Meadows restroom and the existing soil treatment area abandoned. The Oak Meadows restroom will be renovated to achieve ADA compliance.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents