Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

Stephenson-Taylor Water Line Extension
Infrastructure
Post-Bid
$250,000 CJ est. value
Binger, OK 73009

Waterline Replacement - Memorial Road and Lake Hefner Parkway
Infrastructure
Results
$875,000 est. value
Oklahoma City, OK

Hinton Waterline Extension
Infrastructure
Results
$325,000 est. value
Hinton, OK

Stilwell Public Schools Classroom Addition
Addition, Demolition, Infrastructure
Construction
$497,300 CJ est. value
Stilwell, OK 74960

Utilities - SH 152
Infrastructure
Design
$272,500 CJ est. value
Sayre, OK 73662

Bureau of Reclamation Inspection and Regulating Tank Improvements McGee Creek Reservoir
Infrastructure
Bidding
$839,500 CJ est. value
Atoka, OK 74525

Utility Relocation Gate Valves
Infrastructure
Post-Bid

OKC Zoo Water Line Extension
Infrastructure
Results
$500,000 est. value
Oklahoma City, OK

Grade, Drain, Bridge and Surface - SH 8
Infrastructure
Design
$9,000,000 CJ est. value
Cherokee, OK 73728

Wastewater System Improvements 6 Inch Force Main Cherry Tree Rural Water District
Infrastructure
Bidding
$400,000 CJ est. value
Stilwell, OK 74960

Last Updated 03/10/2023 03:34 AM
Project Title

Utilities - US 75

Physical Address View project details and contacts
City, State (County) Atoka, OK 74525   (Atoka County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $272,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-75: Begin 2.18 Miles West of Us-69, Extend Northwest to Coal C/l Ut for 31858(04) As of March 10, 2023, the project is in Design status. Anticipated letting month/year is July, 2024. Length : 2.180 Mi. OKDOT - Utilities - US 75 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents