Similar Projects
Cedar Lake Dam and Roadway Improvements
Renovation, Infrastructure
Post-Bid
Wolcott, CT

Repairs to Pachaug Pond Dam
Results
Less than $3,968,879 est. value
Griswold, CT

Repairs and Modifications to Gate Chambers at Cairns Dam
Results
Warren, CT

Greenville Dam and Canal Repair
Term Contract
Results
Norwich, CT 06360

Hartford Levee Maintenance
Renovation, Term Contract
Results
Hartford, CT

Repairs and Modifications to Upper Bolton Lake Dam
Renovation
Results
Less than $175,000 est. value
Hartford, CT

Coventry High School Fire Door Project - Phase 3
Post-Bid
Coventry, CT

Gate Cylinder Repairs/Replacement
Renovation
Post-Bid
$250,000 to $500,000 est. value
Thomaston, CT 06787

Mirror Lake Dam Temporary Spillway Repairs
Results
Meriden, CT 06451

Pine Acres Lake Dam Rehabilitation
Renovation
Results
Less than $1,353,111 est. value
Hampton, CT 06247

Stamford Transportation Center Pedestrian Tunnel Repairs
Renovation
Post-Bid
Stamford, CT 06902

Cedar Lake Dam and Roadway Improvements Project
Post-Bid
Wolcott, CT

Freshwater Pond Dam
New Construction
Bidding
Enfield, CT

Last Updated 10/12/2021 11:56 AM
Project Title

Primary Tunnel Repairs Project

Physical Address View project details and contacts
City, State (County) Cromwell, CT   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This bid includes furnishing of materials, labor, equipment, and supplies necessary for the: Item 1. Construction of (2) new structural slabs scabbed directly beneath (2) existing structural slabs working from above and below the existing slabs. Work involves supporting reinforcing from above, false-works and structural steel supporting forms from beneath coordinated with existing pipe hangers and reinforcing steel. Minimize disruptions to plant operations. Pour self-consolidating concrete (SCC) into the form through inlet and outlet openings cored into the existing slabs working from above. Item 2. Patch repair spalled conditions in the tunnel using the specified epoxy grout and bonding details. Item 3. Epoxy coat the walking surface where specified in plans. Apply (2) coats of epoxy at ground level walking surface of concrete tunnel including 2`-0" of adjoining side walls.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents