Similar Projects
Bexley North - Infrastructure
New Construction
Design
Inman, SC

Silver Steps Hiking Trail Construction
Post-Bid
$40,000 to $50,000 est. value
Greenville, SC 29635

Blythewood Pedestrian Railing System
Term Contract
Post-Bid
Blythewood, SC 29016

Columbia Avenue Pedestrian Improvements
Results
Rock Hill, SC

Edgemont Parking Lot Construction
Results
Less than $294,010 est. value
Rock Hill, SC

CVS #2555 - ADA Site Renovations
Renovation - 4,500 SF
Construction
Gaffney, SC 29341

CVS #3565 - ADA Site Renovation
Renovation - 10,186 SF
Construction
Cheraw, SC 29520

Martin Luther King Jr. Boulevard (S-17-96) Sidewalk Improvements
Post-Bid
Dillon, SC

Little Mountain Elementary Walking Track
Results
Little Mountain, SC 29075

Repairs to Walking Tracks
Post-Bid
Marion, SC 29571

Greenway Trail Project - Phase 2B
Results
Green Pond, SC

Bay Creek Park Parking Lot Improvements
Post-Bid
$15,000 to $30,000 est. value
Edisto Island, SC 29438

Baseball Alley Realignment and Improvements
Results
Less than $464,046 est. value
Chester, SC

Greenwood District Office Site Improvements
Post-Bid
$40,000 to $70,000 est. value
Greenwood, SC 29646

Concrete Drives
Results
Gray Court, Waterloo, SC 29645

Reported 02/25/2020 12:00 AM
Project Title

Oscar Frazier Park Field of Dreams Walkway

Physical Address View project details and contacts
City, State (County) Bluffton, SC 29910   (Beaufort County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install approximately 1,320 linear feet of sidewalk around the Oscar Frazier Park Field of Dreams located at 7 Recreation Court. The general scope of services includes the following: 1. Mobilization 2. Clearing and Grading 3. Erosion and sediment control 4. Minor Drainage Installation 5. Sidewalk Construction 6. Landscaping

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents