Similar Projects
Boiler Replacement/ Camp Williams
Alteration
Conception
$444,400 est. value
Camp Douglas, WI

Install Dump Probes and High Water Probes at the Boiler Bldg. 112
Term Contract
Design
Milwaukee, WI 53295

Stanley Correctional Institution - Heating Pipe System Replacement
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Stanley, WI 54768

Boiler Maintenance Services at Airport
Term Contract
Post-Bid
Green Bay, WI 54313

Le Phillips Library - Bp04 Drapery And Track
Renovation, Alteration
Post-Bid
Eau Claire, WI 54701

Boiler and Cooling Tower Pumps Replacement
Results
Oshkosh, WI

Green Bay Boiler Replacement
Results
$166,000 est. value
Madison, WI

DPW Shed Insulation and Heat Upgrade
Alteration
Post-Bid
Manitowoc, WI

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Boiler Services
Term Contract, Alteration
Post-Bid
Milwaukee, WI

Blower Motor Replacement/Installation
Results
Madison, WI 53701

Monona Terrace Heat Exchanger Maintenance
Alteration
Post-Bid
Madison, WI 53703

Kennedy Elementary School Boiler Replacement 2021
Results
$325,000 est. value
Madison, WI 53714

Business Park Pond and Maintenance
Term Contract
Post-Bid
Stevens Point, WI

Boiler Replacement at Jail
Alteration
Results
Green Bay, WI

Last Updated 01/16/2023 10:01 AM
Project Title

Variable Air Volume Boxes Renovation

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $130,210 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. In general the work consists of: replacement of VAV's in the Applied Arts building as revision to associated fan and light switch controls. Contract offer and construction phase records will be processed electronically on the WisBuild(TM) DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bidding Documents will be available online immediately upon the project being advertised for bid.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents