Similar Projects
Murphy Express #7741
New Construction
Conception
Davie, FL 33024

Murphy Express #7742
New Construction
Conception
Margate, FL 33063

7-Eleven # 34801
New Construction - 7,329 SF
Design
$2,500,000 est. value
Deerfield Beach, FL 33442

Oakland Park Place
New Construction - 291,212 SF
Design
Oakland Park, FL 33334

Cumberland Farms
New Construction - 12,143 SF
Post-Bid
$2,500,000 est. value
Fort Lauderdale, FL 33304

Circle K
New Construction - 5,327 SF
Construction
$2,500,000 est. value
Fort Lauderdale, FL 33311

Wawa # 5331 BRW
New Construction - 14,719 SF
Construction
$1,800,000 est. value
Plantation, FL 33317

Murphy Express
New Construction
Conception
Fort Lauderdale, FL 33319

7-Eleven # 34941
New Construction - 7,700 SF
Design
$1,200,000 est. value
Coconut Creek, FL 33063

7-Eleven # 1036521
New Construction - 3,940 SF
Construction
$1,103,610 est. value
Dania, FL 33004

Murphy Express
New Construction
Conception
Hollywood, FL 33020

BJ's Wholesale Club - Gas Station
New Construction - 160 SF
Construction
Less than $500,000 CJ est. value
Parkland, FL 33067

Park Road Development
New Construction - 524,835 SF
Conception
$71,100,000 est. value
Hollywood, FL 33021

Costco Fuel Station
New Construction
Construction
Coral Springs, FL 33321

Murphy Express
New Construction
Conception
Hollywood, FL 33023

Last Updated 09/06/2019 12:00 AM
Project Title

Costco Gas Station Relocation and Expansion

Physical Address View project details and contacts
City, State (County) Pompano Beach, FL 33060   (Broward County)
Category(s) Commercial
Sub-Category(s) Gas Station
Contracting Method
Project Status Construction Commenced August 2018, Construction Complete as of April 2019
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description New 6,192 square foot gas station canopy and a new 110 square foot controller building.
Details 1 Gas Station, 1 Story Above Grade, 6,192 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents