Similar Projects
Douglas Byrd Middle School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

Douglas Byrd High School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Morganton Road Elementary School, Kitchen HVAC Addition and Building F HVAC Unit Replacement
Results
Fayetteville, NC 28303

Pine Forest High School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28311

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Benjamin Martin Elementary School and Ponderosa Elementary School Kitchen HVAC Additions
Results
Fayetteville, NC 28303

Lewis Chapel Middle School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28314

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

Seventy-First High School, Kitchen HVAC Addition
Results
Fayetteville, NC 28304

Douglas Byrd High Kitchen AC Replacement
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28304

EE Smith Science Class Rooms AC Replacement
Alteration
Post-Bid
Fayetteville, NC 28301

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

Last Updated 12/09/2021 04:03 PM
Project Title

Spring Lake Package AC Replacements

Physical Address View project details and contacts
City, State (County) Spring Lake, NC 28390   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000 to $30,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove and dispose of three existing 5 ton package units. The contractor shall supply and install three new 5 ton package heat pumps with thermostats. The new equipment shall match the existing equipment Btu, voltage and phase. The units for D wing shall be the same type. The contractor shall supply and install new tstat wire if needed. The contractor shall supply new disconnects with new conduit and power wire from the new disconnect to the new unit. All duct work shall be sealed with mastic.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents