Similar Projects
Roadway and Drainage Improvements for Shary Business Park Subdivision
Infrastructure
Bidding
Mission, TX

Roadway and Drainage Improvements for Shary Business Park Subdivision
Infrastructure
Bidding
Mission, TX

Lateral (Phase I) - 2018 Bond Referendum Project
Post-Bid
Edinburg, TX 78542

Lateral (Phase II) - 2018 Bond Referendum Project
Post-Bid
Less than $2,324,498 est. value
Edinburg, TX

Southern Region Disaster Recovery Support BPA
Results

PHARR FY 15 DAP Northbound Lanes Project and 2 BSIF Exit Project
Results
$4,600,000 to $5,000,000 est. value
Pharr, TX

Supply Contract for the Purchase of Reinforced Concrete Pipe, Manholes and Inlets
Term Contract
Bidding
Pharr, TX

South Lateral Drain Improvements Phase I
Post-Bid
Less than $3,000,000 est. value
Edinburg, TX 78542

Paving Reconstruction Improvements Phase 3
Results
San Juan, TX 78589

Northwest Blueline Hibiscus Tributary Improvements
Infrastructure
Bidding
McAllen, TX

Pleasantview and 11th Street Drainage Improvements
Post-Bid
Less than $3,500,000 est. value
Weslaco, TX 78596

Utility and Paving Improvements for the Shops At Tres Lagos
Results
McAllen, TX 78501

Single Machine Repaving Project Year 6
Infrastructure
Bidding
Pharr, TX

Mile 3 N Road Project (FM 492 to Tom Gill)
Post-Bid
$14,350,000 est. value
Edinburg, TX 78539

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Last Updated 10/18/2021 10:07 AM
Project Title

365 Tollway Project (Segments 1 and 2)

Physical Address View project details and contacts
City, State (County) Pharr, TX 78577   (Hidalgo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $255,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for the construction of a 12.2 mile tolled facility from 0.58 miles west of FM 396 (Anzalduas Highway) to 0.07 mile north of US 281 (Military Highway) at its intersection with San Juan Road. Project is inclusive of thirteen (13) grade-separated interchanges and one floodway bridge structure; USIBWC levee relocations; and roadway work consisting of: grading, cement treated flexible base, lime treated subgrade, asphaltic concrete pavement, continuously reinforced concrete pavement, retaining walls, culverts, reinforced concrete pipe, drainage appurtenances, irrigation structures, irrigation appurtenances, traffic signals, illumination, signing, pavement markings, toll gantries, toll equipment, fiber optic network, CCTV cameras, vehicle detection system, Bluetooth, dynamic message signs, wireless antennas, ITS poles and cabinets, ground boxes and conduit, etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents